* <span style="color:#ff0000"> Cable/HRS motion:</span> add cable length and re-route the needed cables. Disconnect the others ?
 
* <span style="color:#ff0000"> Cable/HRS motion:</span> add cable length and re-route the needed cables. Disconnect the others ?
  
* Left cerenkov overflow: move ADC from ROC 3 to ROC 4. Could we split the signal between the existing ADC in ROC 3 and the ADC in ROC 4 ?
+
* <span style="color:#ff0000"> Left cerenkov overflow:</span> move ADC from ROC 3 to ROC 4. Could we split the signal between the existing ADC in ROC 3 and the ADC in ROC 4 ?
  
* Deadtime:  
+
* <span style="color:#ff0000"> Deadtime:</span>
 
                 - remove the sequencer reading of BB and only read the main trigger module.
 
                 - remove the sequencer reading of BB and only read the main trigger module.
 
                 - or set hight threshold on unused channels.
 
                 - or set hight threshold on unused channels.
  
* Right arm Shower block 76 missing signal: check that it is at the bottom of the acceptance if cannot be fixed.
+
* <span style="color:#ff0000"> Right arm Shower block 76 missing signal:</span> check that it is at the bottom of the acceptance if cannot be fixed.
  
* Right arm S1: one channel is noisy.
+
* <span style="color:#ff0000"> Right arm S1:</span> one channel is noisy.
  
* Right arm Cerenkov:  
+
* <span style="color:#ff0000"> Right arm Cerenkov:</span>
 
               - multi-peak in the TDCs: gate width problem ?
 
               - multi-peak in the TDCs: gate width problem ?
 
               - no obvious single photon electron peak in ADCs: increase HV.
 
               - no obvious single photon electron peak in ADCs: increase HV.
  
* Right Q3: run Q3 at momentum ?% lower for each momentum setting.
+
* <span style="color:#ff0000"> Right Q3:</span> run Q3 at momentum ?% lower for each momentum setting.

Revision as of 21:18, 10 April 2011

  • Cable/HRS motion: add cable length and re-route the needed cables. Disconnect the others ?
  • Left cerenkov overflow: move ADC from ROC 3 to ROC 4. Could we split the signal between the existing ADC in ROC 3 and the ADC in ROC 4 ?
  • Deadtime:
               - remove the sequencer reading of BB and only read the main trigger module.
               - or set hight threshold on unused channels.
  • Right arm Shower block 76 missing signal: check that it is at the bottom of the acceptance if cannot be fixed.
  • Right arm S1: one channel is noisy.
  • Right arm Cerenkov:
              - multi-peak in the TDCs: gate width problem ?
              - no obvious single photon electron peak in ADCs: increase HV.
  • Right Q3: run Q3 at momentum ?% lower for each momentum setting.