Difference between revisions of "G2p"

From Hall A Wiki
Jump to: navigation, search
(Minutes)
Line 44: Line 44:
 
*2012 Accelerator [http://www.jlab.org/exp_prog/experiment_schedule/2010/11-17/ten_schedule2012.html Schedule]
 
*2012 Accelerator [http://www.jlab.org/exp_prog/experiment_schedule/2010/11-17/ten_schedule2012.html Schedule]
  
==Replay==
 
*Replay info to be posted here...
 
  
 
==Saftey Documentation==
 
==Saftey Documentation==
*Saftey is the key
+
*Saftey documents to be posted here...
  
 
==Talks and Presentations==
 
==Talks and Presentations==

Revision as of 19:11, 15 June 2011

The g2p Experiment

Meeting Minutes

Collaboration Meetings

  • July 11-22, 2011 Tentative date of next meeting

Spectrometer Optics

Analysis

Polarized Target

Runplan/Schedule


Saftey Documentation

  • Saftey documents to be posted here...

Talks and Presentations

  • 2011 NSTAR, K. Slifer (pdf)
  • 2011 Hall A Workshop, K. Slifer (ppt)
  • 2010 One Slide Summary ppt

Technotes

  • E08-027 technical docs to be posted here...

Mailing List

There are two mailing lists relevant to g2p:

  • g2p@jlab.org : General announcements
  • g2p_ana@jlab.org : Weekly analysis

You can subscribe to both at http://mailman.jlab.org

Help