Difference between revisions of "G2p Analysis Minutes"

From Hall A Wiki
Jump to: navigation, search
Line 20: Line 20:
 
1) Preparing a computer in the hall for the DAQ of the 3rd arm
 
1) Preparing a computer in the hall for the DAQ of the 3rd arm
 
2) Preparing for the target field measurement  
 
2) Preparing for the target field measurement  
 +
 +
 +
*Pengjia:
 +
1) Continue working on the remote control program for the function generator
  
 
*Kalyan:
 
*Kalyan:
Line 26: Line 30:
 
   
 
   
 
*Jixie:
 
*Jixie:
1) Learning the optics from Nilanga, will meet with Vince to discuss the optics plan  
+
1) Learning the optics from Nilanga, will meet with Vince to discuss the optics plan <br>
2) Try to test the magnetize effect of the translation table. Replace some steel bolts and nuts  
+
2) Tri to test the magnetize effect of the translation table. Replaced some steel bolts and nuts  
with plastic ones.
+
with plastic ones. Toby and Chao will make a coil to test the stainless steel. <br>
 
3) Running simulation to get local beam dump opening for Al.  But the HRS transportation routines
 
3) Running simulation to get local beam dump opening for Al.  But the HRS transportation routines
from Min do not work.
+
from Min do not work. <br>
 
+
 
+
*Pengjia:
+
1) Continue working on the remote control program for the function generator
+

Revision as of 16:09, 22 June 2011

Minutes of the weekly analysis meetings

Minutes_Jan2011_to_June_2011


6/22/2011: Present: Kalyan, Jixie, Chao, Pengjia, Mellisa, Vincent, Ryan, Toby, Alexandre, Jie Liu

  • Toby:

1) Tested 4 cables for the slow raster with Ryan
2) Worked with Chao and Jixie to prepare to measure the target field

  • Ryan:

1) Continue working on the HRS trigger

  • Melissa:

1) Replaying xgt2 data. Looking at the pedestal of adc to find out if there are dead channels
2) Updating the safety document for g2p based on the one used in SANE experiment

  • Chao:

1) Preparing a computer in the hall for the DAQ of the 3rd arm 2) Preparing for the target field measurement


  • Pengjia:

1) Continue working on the remote control program for the function generator

  • Kalyan:

1) Continue designing the 3rd arm
2) Got confirmed from Al that 3rd arm can not be used in GEP

  • Jixie:

1) Learning the optics from Nilanga, will meet with Vince to discuss the optics plan
2) Tri to test the magnetize effect of the translation table. Replaced some steel bolts and nuts with plastic ones. Toby and Chao will make a coil to test the stainless steel.
3) Running simulation to get local beam dump opening for Al. But the HRS transportation routines from Min do not work.