Difference between revisions of "Target Operator Duties"
From Hall A Wiki
(→List of Target Operator Responsibilities) |
|||
Line 13: | Line 13: | ||
===Anneals=== | ===Anneals=== | ||
Anneals may be performed by target operators, but notify the Target Expert On-Call at least 15 minutes before you intend to start one. | Anneals may be performed by target operators, but notify the Target Expert On-Call at least 15 minutes before you intend to start one. | ||
+ | * more to come | ||
+ | |||
+ | ===Thermal Equilibrium Measurements=== |
Revision as of 22:55, 10 September 2011
Contents
List of Target Operator Responsibilities
- Fill in Shift Checklist and sign at the end of your shift.
- Take screenshots of the polarization display panel and cryogenics display panel twice during your shift.
- If something has gone wrong and you don't know how to fix it, call the g2p Target Expert On-Call.
More to come...
Microwaves
- Adjust the microwave frequency in small increments, up or down. If the polarization appears to decrease due to your changes, go back and look the other way.
- Carefully record the microwave frequencies, noting which ones maximize polarization and which ones decrease it in the target logbook.
Anneals
Anneals may be performed by target operators, but notify the Target Expert On-Call at least 15 minutes before you intend to start one.
- more to come