Difference between revisions of "Thursday, November 17, 4:00pm ETD"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 17: Line 17:
 
** haven't truly double-checked, but have fixed issues with changing GEANT versions
 
** haven't truly double-checked, but have fixed issues with changing GEANT versions
 
<br>
 
<br>
* Collimator/field configuration comparison update (Sereres)
+
* Field configuration comparison update (Sereres)
 
** fieldmap comparison (see [http://ace.phys.virginia.edu/MollerSpectrometer/211 elog 211])
 
** fieldmap comparison (see [http://ace.phys.virginia.edu/MollerSpectrometer/211 elog 211])
  

Latest revision as of 14:47, 17 November 2011

Agenda

Presentations:

  • Updates to mollersim geometry (Juliette)
    • Added the hybrid coil (see elog 209)
    • Need to investigate effect of "necessary gaps"
    • Need to properly code the collimators in the hybrid region (see elog 205)


  • Investigations of generators (see Seamus' log entry elog 210)
    • Add detectors right after target and right after "acceptance" collimator
    • triple-check the current generator and compare result without energy loss to theory
    • compare to "GEANT4" generator results (let it run a long time)
    • use GEANT4 to get the pre-vertex energy loss (track backwards)
    • add MS code and compare to the GEANT4 generated energy loss


  • Investigation of the physics lists
    • can use the "standard" physics lists - at least to compare
    • haven't truly double-checked, but have fixed issues with changing GEANT versions


  • Field configuration comparison update (Sereres)

Minutes



Return to Teleconferences
Return to MOLLER at 11 GeV E09-005