Difference between revisions of "E04-018 DAQ"
From Hall A Wiki
(→Coincidence timing cabling) |
|||
Line 28: | Line 28: | ||
RG58 | RG58 | ||
*1 T1 Right | *1 T1 Right | ||
− | *2 T5 from right | + | *2 T5 from right to NIM/ECL on left ARM slot 9 left NIM crate PS 726 channel 14 to Fastbus 1875 chan 48 ( black negative ) |
*3 EDTM ? | *3 EDTM ? | ||
[[Image:Example.jpg]] | [[Image:Example.jpg]] |
Revision as of 11:56, 28 November 2006
Contents
Useful
Left arm detector stack phone 5151
General Information
For E04-018, TS was moved by Bob fron Left Arm to Right Arm to be able to have sufficient delays.
This section will have informations about the changes made for this experiment.
Since TS was moved were changed :
- cabling
- scalers
- delays
- Start of run / End of run
Coincidence timing cabling
RG213 on right ARM
- 1 T3
- 2 ? going into NIM ECL channel 4 (Lower left right crate ) to TS R Arm input 4 -> it's T4 !
- 3 labeled retiming from left arm to NIM lower left to PS715 discriminator channel 5 ( bottom module )to 7126 NIM/ECL channel 14 to R delay 2 channel 11 to NIM/ECL 7126 channel 15 (NIM left top slot 16 )to NIM/ECL (NIM right slot 3 channel 6) to FB 13 to TDC 1875 chan 32 , left arm retiming
- 4 Right arm retiming
- 5 ? going into NIM ECL channel output 14 (Lower left right crate ) wire pink and blue from TS L1A0
- 6 EDTM trigger
RG58
- 1 T1 Right
- 2 T5 from right to NIM/ECL on left ARM slot 9 left NIM crate PS 726 channel 14 to Fastbus 1875 chan 48 ( black negative )
- 3 EDTM ?
1875 Right Arm
Slot ROC 16
- 1
- 32 FB13 Left CT
- 34 FB3
- 37 FB5
- 43 FB12
- 47 FB4
Ldelay
Rdelay1
Rdelay2
- 9 Right delayed L1A for RT
- 10-16 delay retiming left arm