Difference between revisions of "GMp Tasks and pending issues"
From Hall A Wiki
Line 4: | Line 4: | ||
[[Task assignement August 15th 2010]] | [[Task assignement August 15th 2010]] | ||
+ | |||
+ | Pending issues | ||
+ | *HRS | ||
+ | ** FPP and DVCS electronics space | ||
+ | *Stand | ||
+ | ** interference sieve box, DVCS stand | ||
+ | *Target | ||
+ | ** Length of racetrack cell | ||
+ | |||
Experiment tasks | Experiment tasks | ||
Line 13: | Line 22: | ||
*dead time | *dead time | ||
*lumi | *lumi | ||
− | |||
Line 26: | Line 34: | ||
|- | |- | ||
|Alexandre Camsonne | |Alexandre Camsonne | ||
− | | | + | | ARS DAQ, Slow control, decoding, paperwork |
| Trigger | | Trigger | ||
| | | | ||
− | * | + | * ARS test readout |
− | * | + | * ARS final readout |
− | * HRS Trigger | + | * Buffering test |
+ | * DVCS HRS Trigger implementation | ||
+ | * Test decoder | ||
+ | * <s> Slow control LED </s> | ||
+ | * Slow control current ADC | ||
+ | * HRS integration | ||
+ | * <s>COO</s> | ||
+ | * <s>ESAD</s> | ||
+ | * <s>RSAD</s> | ||
+ | * TOSP | ||
| | | | ||
* 100 % ( need implement checks and not working 100 % ) | * 100 % ( need implement checks and not working 100 % ) | ||
− | + | * 60 % ( crates being added ) | |
+ | * 90 % ( seems to work - need synch check ) | ||
+ | * 60% ( ) | ||
+ | * 70 % ( need implement checks - several ROCs) | ||
+ | * 100 % ( hardware ok - need write C functions driver and ROOT interface ) | ||
+ | * 95 % ( Full test with calo ) | ||
+ | * 80% ( waiting for crates to be in HRS ) | ||
+ | * 90 % ( need edit files ) | ||
+ | * 30 % ( need adapt to DVCS ) | ||
+ | * 100 % ( Pavel waiting to send for signatures ) | ||
+ | * 0 % ( still not found old one ) | ||
| | | | ||
− | + | * NA | |
+ | * Aug 30 th | ||
+ | * in progress 08/25/2010 | ||
+ | * 08/30/2010 | ||
+ | * 08/30/2010 | ||
+ | * 08/25/2010 ( 1 day ) | ||
+ | * 08/30/2010 ( cabling needed ) | ||
+ | * when everything in HRS, no later than september | ||
+ | * 08/25/2010 | ||
+ | * 08/30/2010 | ||
+ | * 09/5/2010 | ||
* 09/01/2010 | * 09/01/2010 | ||
− | | | + | | Setup DVCS crates in HRS |
|- | |- | ||
+ | |Eric Fuchey | ||
+ | | Calibration pi0, Photon Compton, RG213 | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | | RG213 | ||
+ | |- | ||
+ | |Florian Itard | ||
+ | | Shift schedule, RG213 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |Magalie Magne | ||
+ | | Electronics ARS + Calorimeter triggger | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | Hisham Albataineh | ||
+ | | | ||
+ | *RG213 | ||
+ | *BPMs cabling | ||
+ | *Trigger cabling | ||
+ | | | ||
+ | | RG213 | ||
+ | | | ||
+ | | RG213 | ||
+ | |- | ||
+ | |Carlos Munoz | ||
+ | | Software, Survey, (Elastic calibration ?),MySQL | ||
+ | | | ||
+ | | | ||
+ | *adaq software | ||
+ | *Waveform analysis | ||
+ | *Survey | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |Julie Roche | ||
+ | | Software, curing, cosmics paddle | ||
+ | | DVCS analysis on adaq | ||
+ | | | ||
+ | | DVCS analysis on adaq | ||
+ | | | ||
+ | |- | ||
+ | |Charles Hyde | ||
+ | | Run plan | ||
+ | | | ||
+ | | Run plan | ||
+ | | Run plan | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | Robert Michaels | ||
+ | | Helicity, HRS trigger, CompSimple | ||
+ | | | ||
+ | | | ||
+ | *Helicity | ||
+ | *HRS trigger | ||
+ | *CompSimple | ||
+ | | | ||
+ | * 80 % - checks left ? | ||
+ | * 50 % - reuse APEX - need Charles timing and logic diagrams - Magalie logic module to complete | ||
+ | * | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |Sophia Iqbal ( until august 31st ) | ||
+ | | <s>Online GUI, EPICS start/end run</s> | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |Kalyan Allada | ||
| Lumi | | Lumi | ||
| | | | ||
Line 48: | Line 163: | ||
| Lumi | | Lumi | ||
} | } | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 17:13, 25 September 2012
Back to DVCS
Previous tables
Task assignement August 15th 2010
Pending issues
- HRS
- FPP and DVCS electronics space
- Stand
- interference sieve box, DVCS stand
- Target
- Length of racetrack cell
Experiment tasks
- scalers
- sync check
- HV
- HRS calibration
- Beamline cablibration
- dead time
- lumi
Name | Expertise | Secondary expert | Task list | Completion level / Completed / Left to be done | Estimated completion date | Main task |
---|---|---|---|---|---|---|
Alexandre Camsonne | ARS DAQ, Slow control, decoding, paperwork | Trigger |
* ARS test readout * ARS final readout * Buffering test * DVCS HRS Trigger implementation * Test decoder * |
* 100 % ( need implement checks and not working 100 % ) * 60 % ( crates being added ) * 90 % ( seems to work - need synch check ) * 60% ( ) * 70 % ( need implement checks - several ROCs) * 100 % ( hardware ok - need write C functions driver and ROOT interface ) * 95 % ( Full test with calo ) * 80% ( waiting for crates to be in HRS ) * 90 % ( need edit files ) * 30 % ( need adapt to DVCS ) * 100 % ( Pavel waiting to send for signatures ) * 0 % ( still not found old one ) |
* NA * Aug 30 th * in progress 08/25/2010 * 08/30/2010 * 08/30/2010 * 08/25/2010 ( 1 day ) * 08/30/2010 ( cabling needed ) * when everything in HRS, no later than september * 08/25/2010 * 08/30/2010 * 09/5/2010 * 09/01/2010 |
Setup DVCS crates in HRS |
Eric Fuchey | Calibration pi0, Photon Compton, RG213 | RG213 | ||||
Florian Itard | Shift schedule, RG213 | |||||
Magalie Magne | Electronics ARS + Calorimeter triggger | |||||
Hisham Albataineh |
|
RG213 | RG213 | |||
Carlos Munoz | Software, Survey, (Elastic calibration ?),MySQL |
*adaq software *Waveform analysis *Survey |
||||
Julie Roche | Software, curing, cosmics paddle | DVCS analysis on adaq | DVCS analysis on adaq | |||
Charles Hyde | Run plan | Run plan | Run plan | |||
Robert Michaels | Helicity, HRS trigger, CompSimple |
|
|
|||
Sophia Iqbal ( until august 31st ) | |
|||||
Kalyan Allada | Lumi | Lumi
} |