Difference between revisions of "Monday, July 10, 2013 11:00 AM - 12:00 PM EDT"

From Hall A Wiki
Jump to: navigation, search
Line 14: Line 14:
  
  
* Update on MOLLER detector simulations: Peiqing Wang [https://userweb.jlab.org/~pqwang/mollerdet_simulation.pdf mollerdet_simulation.pdf] [http://ace.phys.virginia.edu/MollerSpectrometer/216 elog 216] [http://ace.phys.virginia.edu/MollerSpectrometer/217 elog 217] [http://ace.phys.virginia.edu/MollerSpectrometer/218 elog 218]
 
* Update on tracking system status: Mark Pitt for David Armstrong [https://hallaweb.jlab.org/doc-private/ShowDocument?docid=37 DocDB 37][http://www.phys.vt.edu/~pitt/moller_july_2012/pitt_armstrong_tracking_july_2012.pdf pitt_armstrong_tracking_july_2012.pdf]
 
* Brief update on new BCM resolution results and plans: Mark Pitt [https://hallaweb.jlab.org/doc-private/ShowDocument?docid=36 DocDB 36][http://www.phys.vt.edu/~pitt/moller_july_2012/pitt_moller_bcm_jul_26_2012.pdf pitt_moller_bcm_jul_26_2012.pdf]
 
* Suggested topics for August meeting - (update/discussion on integrating mode electronics requirements?, further reports on integration mode detector simulations?, discussion of "optimization" criteria for spectrometer simulations?)
 
  
 
== Minutes ==
 
== Minutes ==

Revision as of 16:23, 7 June 2013

Call-in information

 Calling instructions:
 Toll-Free Number (U.S.&  Canada):  866-740-1260
 International toll number:         303-248-0285
 PARTICIPANT CODE:                     2315321#


Agenda

  • Updates on GEANT4 simulations of the detector/lightguide geometry: Peiqing Wang
  • Discussion of plans for building prototypes: Michael Gericke/Krishna Kumar
  • Progress on detector cart design: Paul Souder/Krishna Kumar
  • Further discussion of Mainz beam test issues: Michael Gericke/Krishna Kumar/Frank Maas previous teleconference info


Minutes



Return to Teleconferences
Return to MOLLER at 11 GeV E09-005