+ | HRS checkout plan after beam is estabilshed on the target with BeO target | ||
+ | HRS angle 15 degrees, momentum P0 = 2.0 GeV/c, Raster size = 3x3 mm, current = 5uA, target = Carbon | ||
+ | Take Left and Right HRS runs in the following order | ||
+ | * | ||
+ | |||
+ | |||
[[12_GeV_March_2014_running]] | [[12_GeV_March_2014_running]] |
Revision as of 14:58, 14 March 2014
HRS checkout plan after beam is estabilshed on the target with BeO target
HRS angle 15 degrees, momentum P0 = 2.0 GeV/c, Raster size = 3x3 mm, current = 5uA, target = Carbon
Take Left and Right HRS runs in the following order