Difference between revisions of "Preparations-DOE2014-Nov-Review"

From Hall A Wiki
Jump to: navigation, search
Line 1: Line 1:
 
*Documentation for Reviewers
 
*Documentation for Reviewers
 
**[http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/report_of_DOE_review_panel_for_SBS_2013.pdf Final report] from DOE Nov 2013 SBS review.
 
**[http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/report_of_DOE_review_panel_for_SBS_2013.pdf Final report] from DOE Nov 2013 SBS review.
**[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/08/sbs_pmp-new-cd-mkj-4.pdf Program Management Plan]. Updated
+
**Response to recommendations
**[http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/RMP-2014.pdf Research Management Plan]. Updated and sent to DOE in Jan 2014 Monthly report to met recommendation #8.
+
***DOE SBS Nov 2013 monthly report included the work flow for GEM module construction to include workforce (by type) required for each step. (Need Evaristo and Nilanga to update).
**Monthly reports
+
***DOE SBS Nov 2013 monthly report develop a written Quality Assurance/test plan, including acceptance criteria for foils and assembled chambers that will be used for both UVa and INFN. (Need Evaristo and Nilanga to update).
***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/07/jlab_sbs_monthly-report_2013dec15_v1.pdf Nov 2013],  [https://cnidlamp.jlab.org/SBS-experiments/JDocDB/node/13 Jan 2014]
+
***Conduct a background assessment for each experimental program that includes background rejection and signal efficiency as a function of trigger cuts, and present at the next review. (Seamus is leading effort).
 +
***[http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/RMP-2014.pdf Research Management Plan]. Updated and sent to DOE in Jan 2014 Monthly report to met DOE Nov 2013 SBS review recommendation #8. (Need one-page report from each group to be sent to Brian Quinn)
 +
***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/08/sbs_pmp-new-cd-mkj-4.pdf Program Management Plan]. Updated to include PMT based Coordinate Detector and list of off-project equipment dependencies and submitted to DOE in Jan 2014. List of milestones for off-project equipment dependencies was sent to DOE in Nov 2013 monthly report. This met DOE Nov 2013 SBS review recommendation #9.
 +
**DOE SBS Monthly reports
 +
***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/07/jlab_sbs_monthly-report_2013dec15_v1.pdf Nov 2013],  [https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/03/jlab_sbs_monthly-report_2014feb15-rmp.pdf Jan 2014],
 
**Technical Detector Reports
 
**Technical Detector Reports
 
***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/08/apv25_readout_system_for_sbs_07_2014.pdf Comparison report of GEM readout systems by University of Virginia]
 
***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/08/apv25_readout_system_for_sbs_07_2014.pdf Comparison report of GEM readout systems by University of Virginia]
 
***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/08/italian-daq-report-june23-2014_-v2.pdf APV-25 based readout electronics for the SBS front GEM tracker by INFN]
 
***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/08/italian-daq-report-june23-2014_-v2.pdf APV-25 based readout electronics for the SBS front GEM tracker by INFN]

Revision as of 17:07, 21 August 2014

  • Documentation for Reviewers
    • Final report from DOE Nov 2013 SBS review.
    • Response to recommendations
      • DOE SBS Nov 2013 monthly report included the work flow for GEM module construction to include workforce (by type) required for each step. (Need Evaristo and Nilanga to update).
      • DOE SBS Nov 2013 monthly report develop a written Quality Assurance/test plan, including acceptance criteria for foils and assembled chambers that will be used for both UVa and INFN. (Need Evaristo and Nilanga to update).
      • Conduct a background assessment for each experimental program that includes background rejection and signal efficiency as a function of trigger cuts, and present at the next review. (Seamus is leading effort).
      • Research Management Plan. Updated and sent to DOE in Jan 2014 Monthly report to met DOE Nov 2013 SBS review recommendation #8. (Need one-page report from each group to be sent to Brian Quinn)
      • Program Management Plan. Updated to include PMT based Coordinate Detector and list of off-project equipment dependencies and submitted to DOE in Jan 2014. List of milestones for off-project equipment dependencies was sent to DOE in Nov 2013 monthly report. This met DOE Nov 2013 SBS review recommendation #9.
    • DOE SBS Monthly reports
    • Technical Detector Reports