Difference between revisions of "Preparations-DOE2014-Nov-Review"
From Hall A Wiki
Line 1: | Line 1: | ||
*Documentation for Reviewers | *Documentation for Reviewers | ||
**[http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/report_of_DOE_review_panel_for_SBS_2013.pdf Final report] from DOE Nov 2013 SBS review. | **[http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/report_of_DOE_review_panel_for_SBS_2013.pdf Final report] from DOE Nov 2013 SBS review. | ||
− | **[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/08/sbs_pmp-new-cd-mkj-4.pdf Program Management Plan]. Updated | + | **Response to recommendations |
− | + | ***DOE SBS Nov 2013 monthly report included the work flow for GEM module construction to include workforce (by type) required for each step. (Need Evaristo and Nilanga to update). | |
− | **Monthly reports | + | ***DOE SBS Nov 2013 monthly report develop a written Quality Assurance/test plan, including acceptance criteria for foils and assembled chambers that will be used for both UVa and INFN. (Need Evaristo and Nilanga to update). |
− | ***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/07/jlab_sbs_monthly-report_2013dec15_v1.pdf Nov 2013], [https://cnidlamp.jlab.org/SBS-experiments/JDocDB/ | + | ***Conduct a background assessment for each experimental program that includes background rejection and signal efficiency as a function of trigger cuts, and present at the next review. (Seamus is leading effort). |
+ | ***[http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/RMP-2014.pdf Research Management Plan]. Updated and sent to DOE in Jan 2014 Monthly report to met DOE Nov 2013 SBS review recommendation #8. (Need one-page report from each group to be sent to Brian Quinn) | ||
+ | ***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/08/sbs_pmp-new-cd-mkj-4.pdf Program Management Plan]. Updated to include PMT based Coordinate Detector and list of off-project equipment dependencies and submitted to DOE in Jan 2014. List of milestones for off-project equipment dependencies was sent to DOE in Nov 2013 monthly report. This met DOE Nov 2013 SBS review recommendation #9. | ||
+ | **DOE SBS Monthly reports | ||
+ | ***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/07/jlab_sbs_monthly-report_2013dec15_v1.pdf Nov 2013], [https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/03/jlab_sbs_monthly-report_2014feb15-rmp.pdf Jan 2014], | ||
**Technical Detector Reports | **Technical Detector Reports | ||
***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/08/apv25_readout_system_for_sbs_07_2014.pdf Comparison report of GEM readout systems by University of Virginia] | ***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/08/apv25_readout_system_for_sbs_07_2014.pdf Comparison report of GEM readout systems by University of Virginia] | ||
***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/08/italian-daq-report-june23-2014_-v2.pdf APV-25 based readout electronics for the SBS front GEM tracker by INFN] | ***[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2014/08/italian-daq-report-june23-2014_-v2.pdf APV-25 based readout electronics for the SBS front GEM tracker by INFN] |
Revision as of 17:07, 21 August 2014
- Documentation for Reviewers
- Final report from DOE Nov 2013 SBS review.
- Response to recommendations
- DOE SBS Nov 2013 monthly report included the work flow for GEM module construction to include workforce (by type) required for each step. (Need Evaristo and Nilanga to update).
- DOE SBS Nov 2013 monthly report develop a written Quality Assurance/test plan, including acceptance criteria for foils and assembled chambers that will be used for both UVa and INFN. (Need Evaristo and Nilanga to update).
- Conduct a background assessment for each experimental program that includes background rejection and signal efficiency as a function of trigger cuts, and present at the next review. (Seamus is leading effort).
- Research Management Plan. Updated and sent to DOE in Jan 2014 Monthly report to met DOE Nov 2013 SBS review recommendation #8. (Need one-page report from each group to be sent to Brian Quinn)
- Program Management Plan. Updated to include PMT based Coordinate Detector and list of off-project equipment dependencies and submitted to DOE in Jan 2014. List of milestones for off-project equipment dependencies was sent to DOE in Nov 2013 monthly report. This met DOE Nov 2013 SBS review recommendation #9.
- DOE SBS Monthly reports
- Technical Detector Reports