Difference between revisions of "Run Plan (DVCS3)"

From Hall A Wiki
Jump to: navigation, search
(=Measure S2m, Cerenkov and wire chamber efficiencies)
Line 1: Line 1:
 +
Assume:
 +
-longitudinally polarized beam
 +
-max 20 uA but for short times when it can go higher
 +
-7.7 GeV-4 pass or  beam
 +
 +
 
== Commissioning/ Calibration ==
 
== Commissioning/ Calibration ==
 
=== Beam instruments ===
 
=== Beam instruments ===

Revision as of 14:36, 9 September 2014

Assume: -longitudinally polarized beam -max 20 uA but for short times when it can go higher -7.7 GeV-4 pass or beam


Commissioning/ Calibration

Beam instruments

BCM

BPMs

Moeller

Compton

Luminosity

Target Boiling

Deadtime check

HRS

Measure efficiencies S2m, Cerenkov and wire chamber

Calorimeter

DC readings

Elastic Calibration

12 GeV Era Run Schedule

youplal

12 GeV Era Run Schedule

more of that

12 GeV Era Run Schedule

and even more