+ | Assume: | ||
+ | -longitudinally polarized beam | ||
+ | -max 20 uA but for short times when it can go higher | ||
+ | -7.7 GeV-4 pass or beam | ||
+ | |||
+ | |||
== Commissioning/ Calibration == | == Commissioning/ Calibration == | ||
=== Beam instruments === | === Beam instruments === |
Revision as of 14:36, 9 September 2014
Assume: -longitudinally polarized beam -max 20 uA but for short times when it can go higher -7.7 GeV-4 pass or beam
Contents
Commissioning/ Calibration
Beam instruments
BCM
BPMs
Moeller
Compton
Luminosity
Target Boiling
Deadtime check
HRS
Measure efficiencies S2m, Cerenkov and wire chamber
Calorimeter
DC readings
Elastic Calibration