Difference between revisions of "Wednesday, November 19: OWL Shift"
From Hall A Wiki
(New page: Go back to Daily Run Plan Daily Run Plans * General considerations ** Vincent Sulkosky is the current Run Coordinator. Please contact me directly via RC phone 757-876-1787 ** Follow th...) |
|||
Line 8: | Line 8: | ||
* Instructions for this shift | * Instructions for this shift | ||
** The target operator is required to supervise the cryo-target. | ** The target operator is required to supervise the cryo-target. | ||
− | ** Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, P<sub>LHRS</sub>= | + | ** Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, P<sub>LHRS</sub>=2.71 GeV, Theta_HRS=22.83, Theta_calo=12.35 |
** Make sure to use the DVCS configuration for all runs. | ** Make sure to use the DVCS configuration for all runs. |
Revision as of 18:34, 18 November 2014
Go back to Daily Run Plan Daily Run Plans
- General considerations
- Vincent Sulkosky is the current Run Coordinator. Please contact me directly via RC phone 757-876-1787
- Follow the generic Instructions for shift takers
- Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
- In general, technical staff should not be contacted by the shift crew - please call the RC first.
- Instructions for this shift
- The target operator is required to supervise the cryo-target.
- Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=2.71 GeV, Theta_HRS=22.83, Theta_calo=12.35
- Make sure to use the DVCS configuration for all runs.