Difference between revisions of "Friday, Decmber 12: SWING Shift"

From Hall A Wiki
Jump to: navigation, search
Line 12: Line 12:
 
** BCM Calib. run
 
** BCM Calib. run
 
** Polarity change/momentum set = 2.71 GeV/c
 
** Polarity change/momentum set = 2.71 GeV/c
 +
 +
* Each run takes 30min long run with different configuration with <b>5uA, LH2 target(loop2), No RASTER</b>
 +
<table>
 +
<tr><td>Num</td><td>configuration</td><td>Tigger Enable</td><td>Tigger Disable</td></tr>
 +
<tr><td>[1]</td><td>DVCS CODA conf (PS9=1;others=0)</td><td>S2M && CER</td><td>Others</td></tr>
 +
<tr><td>[2]</td><td>DVCS CODA conf (PS9=1;others=0)</td><td>S0 && S2M</td><td>Others</td></tr>
 +
<tr><td>[3]</td><td>DVCS CODA conf (PS9=1;others=0)</td><td>S0 && CER</td><td>Others</td></tr>
 +
<tr><td>[4]</td><td>LHRS new CODA conf (GMp config)</td><td>PS1=1 && PS7=1</td><td>Others</td></tr>
 +
<tr><td>[5]</td><td>LHRS new CODA conf (GMp config)</td><td>PS2=1 && PS7=1</td><td>Others</td></tr>
 +
<tr><td>[6]</td><td>LHRS new CODA conf (GMp config)</td><td>PS3=1 && PS7=1</td><td>Others</td></tr>
 +
</table>
 +
** when step[6] page Carlos

Revision as of 20:47, 12 December 2014

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Kijun Park is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
    • Follow the generic Instructions for shift takers
    • Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
    • In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
    • The target operator is required to supervise the cryo-target.
    • Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
    • Note that ion chamber calibrations have ALREADY been done for: carbon (single foil), carbon (five-foil), LH2, and BeO. See this log entry for the first three and this log entry for BeO. The limits on the ion chambers for these targets were set up for currents up to 20 uA.
  • Instructions for this shift
    • BCM Calib. run
    • Polarity change/momentum set = 2.71 GeV/c
  • Each run takes 30min long run with different configuration with 5uA, LH2 target(loop2), No RASTER
NumconfigurationTigger EnableTigger Disable
[1]DVCS CODA conf (PS9=1;others=0)S2M && CEROthers
[2]DVCS CODA conf (PS9=1;others=0)S0 && S2MOthers
[3]DVCS CODA conf (PS9=1;others=0)S0 && CEROthers
[4]LHRS new CODA conf (GMp config)PS1=1 && PS7=1Others
[5]LHRS new CODA conf (GMp config)PS2=1 && PS7=1Others
[6]LHRS new CODA conf (GMp config)PS3=1 && PS7=1Others
    • when step[6] page Carlos