(Pre-experiment checklists, should be done by Oct. 1st, 2008)
(All sub-system's pre-beam check list saved in here)
Line 4: Line 4:
 
=== All sub-system's pre-beam check list saved in here ===
 
=== All sub-system's pre-beam check list saved in here ===
  
Overall Transversity pre-beam checklist  
+
[[Transversity/pre-beam checklist|Overall Transversity pre-beam checklist]].
[http://hallaweb.jlab.org/experiment/transversity/wikifile/prebeam_checklist_072108.txt  Xiaodong Jiang's txt file as of 07/23/2008]
+
  
 
== Hall A floor plan layout for Transversity/d2n ==
 
== Hall A floor plan layout for Transversity/d2n ==

Revision as of 15:49, 24 July 2008

This is the run plan for transversity experiment

Pre-beam checklists, should be done by Oct. 1st, 2008

All sub-system's pre-beam check list saved in here

Overall Transversity pre-beam checklist.

Hall A floor plan layout for Transversity/d2n

Commissioning run plan

1st order run plan, Commissioning Part

Production run plan

1st order run plan, Production part

Switch over to d2n