Difference between revisions of "Target Slow Control"

From Hall A Wiki
Jump to: navigation, search
(Target Slow Control Component)
Line 1: Line 1:
 
== Target Slow Control Component ==
 
== Target Slow Control Component ==
 
Target slow control of consists two EPICS IOCs located in Hall and the new target lab, as shown in the [[Complete System Diagram|target system diagram]]
 
Target slow control of consists two EPICS IOCs located in Hall and the new target lab, as shown in the [[Complete System Diagram|target system diagram]]
 +
 +
=== Hall IOC ===
 +
The IOC in the Hall is behind the [[Green Wall]]. It has
 +
* 3 Holding field current meter, Fluke45, GPIB
 +
* 1 Oven temperature control, Omega, serial
 +
* 1 Heater air flow meter, DP41, serial
 +
* 1 Heater temperature read, DP41, serial
 +
* 1 Target ladder stepping motor, NF90, serial
 +
* 11 oven temperature sensors, 4 wire RTD, wire
 +
 +
=== New Target Lab IOC ===
 +
New target lab is located back to the counting house. The IOC is mainly for the control of the lasers
 +
* 6 Single FAP lasers, Coherent, serial
 +
* 3 Duo FAP lasers, Coherent, serial

Revision as of 03:11, 24 July 2008

Target Slow Control Component

Target slow control of consists two EPICS IOCs located in Hall and the new target lab, as shown in the target system diagram

Hall IOC

The IOC in the Hall is behind the Green Wall. It has

  • 3 Holding field current meter, Fluke45, GPIB
  • 1 Oven temperature control, Omega, serial
  • 1 Heater air flow meter, DP41, serial
  • 1 Heater temperature read, DP41, serial
  • 1 Target ladder stepping motor, NF90, serial
  • 11 oven temperature sensors, 4 wire RTD, wire

New Target Lab IOC

New target lab is located back to the counting house. The IOC is mainly for the control of the lasers

  • 6 Single FAP lasers, Coherent, serial
  • 3 Duo FAP lasers, Coherent, serial