Difference between revisions of "Target Slow Control"

From Hall A Wiki
Jump to: navigation, search
(New Target Lab IOC)
(Hall IOC)
Line 10: Line 10:
 
* 1 Target ladder stepping motor, NF90, serial
 
* 1 Target ladder stepping motor, NF90, serial
 
* 11 oven temperature sensors, 4 wire RTD, wire
 
* 11 oven temperature sensors, 4 wire RTD, wire
* 2 Spin Status Signal, NIM Logical Standard. 1 stand for spin along holding field direction; another for antiparallel.
+
* 2 Spin Status Signals, NIM Logic, 50 Ohm coaxial (1 stand for spin along holding field direction; another for anti-parallel)
  
 
=== New Target Lab IOC ===
 
=== New Target Lab IOC ===

Revision as of 16:53, 24 July 2008

Target Slow Control Component

Target slow control consists of two EPICS IOCs located in Hall and the new target lab, as shown in the target system diagram

Hall IOC

The IOC in the Hall is behind the Green Wall. It has

  • 3 Holding field current meter, Fluke45, GPIB
  • 1 Oven temperature control, Omega, serial
  • 1 Heater air flow meter, DP41, serial
  • 1 Heater temperature read, DP41, serial
  • 1 Target ladder stepping motor, NF90, serial
  • 11 oven temperature sensors, 4 wire RTD, wire
  • 2 Spin Status Signals, NIM Logic, 50 Ohm coaxial (1 stand for spin along holding field direction; another for anti-parallel)

New Target Lab IOC

New target lab is located back to the counting house. The IOC is mainly for the control of the lasers

  • 6 Single FAP lasers, Coherent, serial
  • 3 Duo FAP lasers, Coherent, serial
  • 3 COMET lasers, Newport, serial