Difference between revisions of "Beam Line"

From Hall A Wiki
Jump to: navigation, search
(E06-010 Instrumentation Requirement List)
Line 1: Line 1:
== E06-010 Instrumentation Requirement List: JP's memo to Kees 08/07/08
+
 
 +
== E06-010 Instrumentation Requirement List: Jian-Ping Chen's memo to Kees De Jager, 08/07/08 ==
 +
 
 
[http://hallaweb.jlab.org/experiment/transversity/wikifile/transn_requirement.doc .doc file]  and  
 
[http://hallaweb.jlab.org/experiment/transversity/wikifile/transn_requirement.doc .doc file]  and  
[http://hallaweb.jlab.org/experiment/transversity/wikifile/transn_requirement.htm htm file] ==
+
[http://hallaweb.jlab.org/experiment/transversity/wikifile/transn_requirement.htm htm file]
  
 
== ARC energy measurement ==
 
== ARC energy measurement ==
Line 16: Line 18:
  
 
== Moller polarimeter and results of measurements ==
 
== Moller polarimeter and results of measurements ==
 +
 +
== Scattering chamber upstream and downstream beam pipe size and window thickness ==
  
 
== HAPPEX Luminosity (Lumi) monitors ==
 
== HAPPEX Luminosity (Lumi) monitors ==
 +
 +
== Beam dump ==

Revision as of 14:21, 7 August 2008

E06-010 Instrumentation Requirement List: Jian-Ping Chen's memo to Kees De Jager, 08/07/08

.doc file and htm file

ARC energy measurement

Compton Polarimeter

HARP and HARP scan procedures

Beam raster

Beam charge monitors (BCM) and calibration procedure

Beam position monitors (BPM) and calibration procedure

Moller polarimeter and results of measurements

Scattering chamber upstream and downstream beam pipe size and window thickness

HAPPEX Luminosity (Lumi) monitors

Beam dump