Difference between revisions of "Run Plan (DVCS3)"

From Hall A Wiki
Jump to: navigation, search
Line 5: Line 5:
  
 
Run plan, Beam Energies include Injector Energy
 
Run plan, Beam Energies include Injector Energy
*[[Image:DVCS-kin-E12-06-114_2016_Injector.xlsx.pdf | 1000 px]]
+
*[[Image:DVCS e12-06-114 kinematic feb1216.jpg | 1000 px]]
  
  
Line 12: Line 12:
 
[[Winter 2016 calorimeter calibration (elastic)]]
 
[[Winter 2016 calorimeter calibration (elastic)]]
  
[[https://logbooks.jlab.org/files/2015/05/3338049/LH2runplan-dwh.pdf  Target boiling]]
 
  
  

Revision as of 16:32, 15 February 2016

For the 12 GeV DVCS experiment, go to [DVCS3 wiki ].


For this Winter 2016 we are only scheduled for 10 week. Therefore we estimate that we will only be able to take the data points highlighted in green.

Run plan, Beam Energies include Injector Energy

  • DVCS e12-06-114 kinematic feb1216.jpg


Winter 2016 optic plans

Winter 2016 calorimeter calibration (elastic)




old stuff below



Fall 2014 run plan

Previous version without injector energy:

DVCS-kin-E12-06-114 02-10-16.jpg