Difference between revisions of "Thursday, Mar. 03: OWL Shift"

From Hall A Wiki
Jump to: navigation, search
Line 8: Line 8:
 
<b>Specific mission</b>
 
<b>Specific mission</b>
 
* <b><u>Production Run</u></b>
 
* <b><u>Production Run</u></b>
* Beam set up without Compton chicane for tonight
+
* Beam set up without Compton chicane for tonight (will try to set beam up after RF recovery and BCM calibration tomorrow afternoon)
  
  

Revision as of 17:46, 2 March 2016

Go back to Daily Run Plan Daily Run Plans

General considerations

  • BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
  • Need shift crews for future


Specific mission

  • Production Run
  • Beam set up without Compton chicane for tonight (will try to set beam up after RF recovery and BCM calibration tomorrow afternoon)


Upcoming event(Short Term)

  • Note: MCC RF recovery (8:30-11:30AM, Thursday)

Access Wish List:(controlled access)
1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit
->Then call MCC for controlled access
2/ Andrew Lumanog: (Call 327-5523) : <1hr
3/ Dave/Greg: check Compton laser profile : <1hr
4/ Longwu/Thir: D1 BCM for RHRS


Upcoming event(Long Term)

  • Mar/03 BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D after RF recovery done (around noon)

-- Hall-D will be down for adding new diamond radiator (up to 8hrs): This is good chance for us to BCM calibration


  • Detailed instructions

BCM DOC1DOC2


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++