Difference between revisions of "Thursday, Mar. 03: SWING Shift"
From Hall A Wiki
Line 1: | Line 1: | ||
Go back to Daily Run Plan [[Daily Run Plans]] | Go back to Daily Run Plan [[Daily Run Plans]] | ||
− | * | + | |
− | ** | + | |
+ | <b>Previously...</b> | ||
+ | ** Complete energy measurement with series of Hall-A magnet (mapping)<br> | ||
+ | >> HALOG [https://logbooks.jlab.org/entry/3387270] | ||
+ | ** RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam) | ||
+ | ** Set up beam through Compton chicane | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
<b>Specific mission</b> | <b>Specific mission</b> | ||
− | * Note: | + | * Note: |
+ | 1/ Set up beam through Compton chicane<br> | ||
+ | - Ciprian, Greg and Yves are tuning the beam through Compton<br> | ||
+ | 2/ Expect some production runs through Compton <br> | ||
+ | |||
+ | 3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow<br> | ||
+ | (high beam current 30uA with FC & empty target)<br> | ||
+ | Instruction: | ||
+ | [http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2] | ||
+ | <br> | ||
+ | - Experts on call (Dave/Julie/Thir/...) | ||
+ | - Calo. HV off<br> | ||
+ | |||
− | |||
Revision as of 21:48, 3 March 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- Complete energy measurement with series of Hall-A magnet (mapping)
- Complete energy measurement with series of Hall-A magnet (mapping)
>> HALOG [1]
- RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam)
- Set up beam through Compton chicane
Specific mission
- Note:
1/ Set up beam through Compton chicane
- Ciprian, Greg and Yves are tuning the beam through Compton
2/ Expect some production runs through Compton
3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow
(high beam current 30uA with FC & empty target)
Instruction:
DOC1DOC2
- Experts on call (Dave/Julie/Thir/...)
- Calo. HV off
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++