(New page: Go back to Daily Run Plan Daily Run Plans <b>Previously...</b> * Production data (Kin48_3) <b>Specific mission</b> * Note: 1/ Continue production mode - 15uA through Compton ch...)
 
Line 19: Line 19:
 
  - PreScaleL : PS9 =1, + DVCS config.
 
  - PreScaleL : PS9 =1, + DVCS config.
 
   
 
   
 
+
* Issues:
 +
- Can't control the Alpha Y axis of the raster. (MCC tried reboot but failed) - 1AM
 +
- I came to CH and called to Bill to check
 +
- Bill Gunning came to replace the PS (the escorted access)
 +
- New PS initialization failed / dump diffuser issue, MCC reboot again but IOChla fail again (multi-times escorted access)
 +
- From MCC(9:00AM) meeting, PD said it might be a remote reset switch (needs an analysis by expert).
 +
- If happen again, the remote reset switch will be replaced and more investigate detail during access.
 +
- Raster seemed controllable by MCC (look at the Oscilloscope), but spot++ data showed X did not change at all any current
 +
- Expert called, Bob came and investigating... [https://logbooks.jlab.org/entry/3388258| HALOG]
 +
- Meantime, CHL is crashed. Hall-A is now controlled access
  
  

Revision as of 14:13, 5 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Production data (Kin48_3)



Specific mission

  • Note:

1/ Continue production mode

- 15uA through Compton chicane
- LH2 target
- DVCS ON
- LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
  • Issues:
- Can't control the Alpha Y axis of the raster. (MCC tried reboot but failed) - 1AM
- I came to CH and called to Bill to check
- Bill Gunning came to replace the PS (the escorted access)
- New PS initialization failed / dump diffuser issue, MCC reboot again but IOChla fail again (multi-times escorted access)
- From MCC(9:00AM) meeting, PD said it might be a remote reset switch (needs an analysis by expert). 
- If happen again, the remote reset switch will be replaced and more investigate detail during access.
- Raster seemed controllable by MCC (look at the Oscilloscope), but spot++ data showed X did not change at all any current
- Expert called, Bob came and investigating... HALOG
- Meantime, CHL is crashed. Hall-A is now controlled access 





BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++