Difference between revisions of "Tuesday, Mar. 29: DAY Shift"
From Hall A Wiki
(New page: Go back to Daily Run Plan Daily Run Plans <b>Previously...</b> * MCC restore the beam Hall-A * Resolved all problems they mentioned in this morning (1st pass RF separator/ Moller Qua...) |
|||
Line 11: | Line 11: | ||
<b>Specific mission</b> | <b>Specific mission</b> | ||
− | * Note: | + | * Note:<br> |
− | 1/ Spin-dance (Moller measurement) | + | 1/ ARC energy measurement (Doug) [https://logbooks.jlab.org/entry/3393188]<br> |
− | Issue: Moller Quad setting is not correct... | + | <br> |
− | + | 2/ Spin-dance (Moller measurement)<br> | |
− | + | Issue: Moller Quad setting is not correct...<br> | |
− | + | <br> | |
− | + | 3/ Any chance of opportunity of good beam for physics<br> | |
(beam goes straight ! not through chicane)<br> | (beam goes straight ! not through chicane)<br> | ||
DVCS: Kin_48_4<br> | DVCS: Kin_48_4<br> |
Latest revision as of 14:48, 29 March 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- MCC restore the beam Hall-A
- Resolved all problems they mentioned in this morning (1st pass RF separator/ Moller Quad power cycle/...)
- Spot++ for beam centering with C-hole target
Specific mission
- Note:
1/ ARC energy measurement (Doug) [1]
2/ Spin-dance (Moller measurement)
Issue: Moller Quad setting is not correct...
3/ Any chance of opportunity of good beam for physics
(beam goes straight ! not through chicane)
DVCS: Kin_48_4
- 15uA
- LH2 target
- DVCS ON
- Calo_theta= 10.1(deg), Distance = 2.5m (from target) - LHRS=3.36GeV, angle=24.925(deg), Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- RHRS=2.204GeV, angle=48.75(deg)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
Tentative plan:
Tuesday:
Arc energy measurement : Doug (Morning)
Moller measurement : Sasha (Afternoon)
Wednesday:
Establish the beam through Compton chicane: Dave & Yves
Thursday:
MCC beam study
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++