(New page: Go back to Daily Run Plan Daily Run Plans <b>Previously...</b> * ARC energy measurement <br> <b>Specific mission</b> * Production on LH2 DVCS: Kin_48_4<br> - 15uA<br> - LH2 tar...) |
|||
Line 3: | Line 3: | ||
<b>Previously...</b> | <b>Previously...</b> | ||
+ | * restore beam (NL vacuum/cooling issue) | ||
* ARC energy measurement | * ARC energy measurement | ||
− | <br> | + | <br> |
<b>Specific mission</b> | <b>Specific mission</b> | ||
− | * Production | + | *Note: <br> |
+ | |||
+ | 1/ HARP scan<br> | ||
+ | <br> | ||
+ | <br> | ||
+ | 2/ C-hole and Spot++ with BPM<br> | ||
+ | (special long (30min) run: Charles request) | ||
+ | <br> | ||
+ | <bR> | ||
+ | 3/ Production<br> | ||
+ | |||
DVCS: Kin_48_4<br> | DVCS: Kin_48_4<br> |
Latest revision as of 01:24, 2 April 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- restore beam (NL vacuum/cooling issue)
- ARC energy measurement
Specific mission
- Note:
1/ HARP scan
2/ C-hole and Spot++ with BPM
(special long (30min) run: Charles request)
3/ Production
DVCS: Kin_48_4
- 15uA
- LH2 target
- DVCS ON
- Calo_theta= 10.1(deg), Distance = 2.5m (from target) - LHRS=3.36GeV, angle=24.925(deg), Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- RHRS=2.204GeV, angle=48.75(deg)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
- Raster : 2x2mm^2
BPM/Spot++ Check
- After a period of 3 hours or more without beam (like beam study, pass change,...) ask MCC to run 5uA 2 by 2 rastered beam on the carbon hole target and make sure you can see the hole (use Spot++ to analyze the C hole run)