Difference between revisions of "Target Operator Check List"

From Hall A Wiki
Jump to: navigation, search
(New page: Target Operator Should Finish This check list for every shift. == Every Half Hour == * Pumping Laser Absorption Spectrum * No Error in Spin Flip Control Status Window * 5 Heart Beats are ...)
 
(After Call for a Bean on Request to MCC)
Line 17: Line 17:
 
* Screen Shot Cell Temperature Reading
 
* Screen Shot Cell Temperature Reading
  
== After Call for a Bean on Request to MCC ==
+
== After Call for Beam to MCC ==
 
* Check Raster Size
 
* Check Raster Size
 
* Check Beam Current
 
* Check Beam Current
 +
* Check Trigger Rate

Revision as of 16:42, 3 November 2008

Target Operator Should Finish This check list for every shift.

Every Half Hour

  • Pumping Laser Absorption Spectrum
  • No Error in Spin Flip Control Status Window
  • 5 Heart Beats are on for Spin Flip Main Window

Every 2 Hour

  • Check polarization drift
  • Check Cell Temperature
  • Check Oven Temperature

Every Shift

  • Generate a Report from Spin Flip Main Window
  • Screen Shot Pumping Laser Absorption Spectrum
  • Screen Shot Laser Control Window
  • Screen Shot Cell Temperature Reading

After Call for Beam to MCC

  • Check Raster Size
  • Check Beam Current
  • Check Trigger Rate