Difference between revisions of "Target Operator Check List"
From Hall A Wiki
(→After Call for a Bean on Request to MCC) |
(→Every Half Hour) |
||
Line 5: | Line 5: | ||
* No Error in Spin Flip Control Status Window | * No Error in Spin Flip Control Status Window | ||
* 5 Heart Beats are on for Spin Flip Main Window | * 5 Heart Beats are on for Spin Flip Main Window | ||
+ | * Check Any Yellow Warning Messages or Controls | ||
== Every 2 Hour == | == Every 2 Hour == |
Revision as of 22:32, 8 November 2008
Target Operator Should Finish This check list for every shift.
Every Half Hour
- Pumping Laser Absorption Spectrum
- No Error in Spin Flip Control Status Window
- 5 Heart Beats are on for Spin Flip Main Window
- Check Any Yellow Warning Messages or Controls
Every 2 Hour
- Check polarization drift
- Check Cell Temperature
- Check Oven Temperature
Every Shift
- Generate a Report from Spin Flip Main Window
- Screen Shot Pumping Laser Absorption Spectrum
- Screen Shot Laser Control Window
- Screen Shot Cell Temperature Reading
After Call for Beam to MCC
- Check Raster Size
- Check Beam Current
- Check Trigger Rate