Line 7: | Line 7: | ||
* Task list/status | * Task list/status | ||
− | ** tolerance analysis | + | ** tolerance analysis |
− | ** material irradiation | + | ** material irradiation |
− | ** radiation loads | + | ** radiation loads |
− | ** impact of environmental variations | + | ** impact of environmental variations |
− | ** floor loading | + | ** floor loading |
− | ** fringe field impact | + | ** fringe field impact |
* Status of MIT/JLAB work | * Status of MIT/JLAB work | ||
** funding for new work | ** funding for new work |
Revision as of 13:51, 4 October 2017
Last meeting: Wednesday May 24, 2017 2:00pm ET
Agenda
- Task list/status
- tolerance analysis
- material irradiation
- radiation loads
- impact of environmental variations
- floor loading
- fringe field impact
- Status of MIT/JLAB work
- funding for new work
- MIT/SBU spectrometer prototype fabrication status
- a bulleted list of the objectives of prototype testing
- a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
- a breakdown of the MIT request
- coil tests
- collimator/apparatus engineering
- other activities
- Next meeting
Minutes
- Task list/status
- tolerance analysis (in progress)
- material irradiation (new studies not begun)
- radiation loads (new studies not begun)
- impact of environmental variations (???)
- floor loading (???)
- fringe field impact (maps created, sims not run)
- Status of MIT/JLAB work
- funding for new work
- MIT/SBU spectrometer prototype fabrication status
- a bulleted list of the objectives of prototype testing
- a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
- a breakdown of the MIT request
- coil tests
- collimator/apparatus engineering
- other activities