Difference between revisions of "Wednesday October 4, 2017 2:00pm ET"
From Hall A Wiki
(→Agenda) |
(→Minutes) |
||
Line 40: | Line 40: | ||
** funding for new work - request is in; they are considering it | ** funding for new work - request is in; they are considering it | ||
** MIT/SBU spectrometer prototype fabrication status | ** MIT/SBU spectrometer prototype fabrication status | ||
+ | *** conductor arrived; tooling arrives within the week. Waiting for another drive. | ||
+ | *** beginning of December may be good for a visit for Juliette | ||
*** a bulleted list of the objectives of prototype testing | *** a bulleted list of the objectives of prototype testing | ||
*** a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate) | *** a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate) | ||
Line 47: | Line 49: | ||
*** collimator/apparatus engineering | *** collimator/apparatus engineering | ||
*** other activities | *** other activities | ||
− | * Next meeting | + | * Next meeting in two weeks; maybe a new time |
<br><br> | <br><br> |
Revision as of 14:18, 4 October 2017
Last meeting: Wednesday May 24, 2017 2:00pm ET
Agenda
- Task list/status
- tolerance analysis
- material irradiation
- radiation loads
- impact of environmental variations
- floor loading
- fringe field impact
- Status of MIT/JLAB work
- funding for new work
- MIT/SBU spectrometer prototype fabrication status
- a bulleted list of the objectives of prototype testing
- a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
- a breakdown of the MIT request
- coil tests
- collimator/apparatus engineering
- other activities
- Next meeting
Minutes
- Task list/status
- tolerance analysis (in progress at Manitoba)
- material irradiation (Rakitha will provide info to Juliette and MIT)
- radiation loads (Rakitha will provide info to Juliette and MIT)
- impact of environmental variations (Juliette will initiate conversation)
- floor loading (MIT should approach JLAB about doing this estimate)
- fringe field impact (fully at Manitoba)
- EB meeting this week
- Collaboration meeting mid-month
- Status of MIT/JLAB work
- funding for new work - request is in; they are considering it
- MIT/SBU spectrometer prototype fabrication status
- conductor arrived; tooling arrives within the week. Waiting for another drive.
- beginning of December may be good for a visit for Juliette
- a bulleted list of the objectives of prototype testing
- a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
- Ernie should continue to be the point man with Everson-Tesla
- a breakdown of the MIT request
- coil tests
- collimator/apparatus engineering
- other activities
- Next meeting in two weeks; maybe a new time