Difference between revisions of "Wednesday November 1, 2017 3:00pm ET"

From Hall A Wiki
Jump to: navigation, search
(Minutes)
Line 27: Line 27:
 
* Preparation for MOLLER tracking meeting - status
 
* Preparation for MOLLER tracking meeting - status
 
** Need to go back to reviewers and ask what they meant, if we need to
 
** Need to go back to reviewers and ask what they meant, if we need to
 +
** create a timeline for next 6 months
 
** Radiation dose estimates/material irradiation [https://hallaweb.jlab.org/wiki/images/1/18/Coil_scan_summary.pdf  summary]
 
** Radiation dose estimates/material irradiation [https://hallaweb.jlab.org/wiki/images/1/18/Coil_scan_summary.pdf  summary]
 +
*** have located some "hot spots"
 +
*** need to convert to doses
 +
*** compare to radiation hardness for various materials (epoxy, insulating tape)
 +
*** quantify known materials, is it good enough for MOLLER
 
** Upstream sensitivity studies [https://hallaweb.jlab.org/wiki/images/c/c4/Spectrometer_update_11-1-2017.pdf summary]
 
** Upstream sensitivity studies [https://hallaweb.jlab.org/wiki/images/c/c4/Spectrometer_update_11-1-2017.pdf summary]
 
** Beamline fringe field effects  
 
** Beamline fringe field effects  

Revision as of 15:25, 1 November 2017

Last meeting: Wednesday October 18, 2017 2:00pm ET


Agenda



  • Preparation for MOLLER tracking meeting - status
    • Radiation dose estimates/material irradiation summary
    • Upstream sensitivity studies summary
    • Beamline fringe field effects
    • MIT activities
      • impact of environmental variations
      • floor loading
  • Test coil status/homework
    • Objectives
    • Test plan
    • Schedule
  • Next meeting



Minutes

Attended: Juliette, Seamus, Cameron, Jim, Ernie, KK

  • Preparation for MOLLER tracking meeting - status
    • Need to go back to reviewers and ask what they meant, if we need to
    • create a timeline for next 6 months
    • Radiation dose estimates/material irradiation summary
      • have located some "hot spots"
      • need to convert to doses
      • compare to radiation hardness for various materials (epoxy, insulating tape)
      • quantify known materials, is it good enough for MOLLER
    • Upstream sensitivity studies summary
    • Beamline fringe field effects
    • MIT activities
      • impact of environmental variations
        • expanding and contracting uniformly (that's how water system is being designed)
        • heat load on hot day - just run hotter
        • we need to cool our water anyway - our refrigerator design
      • floor loading - probably not a concern (each component less than what crane can list)
  • Test coil status/homework
    • Objectives
    • Test plan
    • Schedule
  • Next meeting