Difference between revisions of "Wednesday, January 31, 2018 3:00pm ET"
From Hall A Wiki
(→Minutes) |
(→Minutes) |
||
Line 14: | Line 14: | ||
Attendance: Juliette, KK, Cameron, Ernie, Jim, Rakitha<br> | Attendance: Juliette, KK, Cameron, Ernie, Jim, Rakitha<br> | ||
# Prototype coil | # Prototype coil | ||
− | + | ## water test plumbed incorrectly | |
+ | ## shipping on winding device | ||
+ | ## B-stage - stuck together turn-to-turn when moved to vacuum chamber | ||
+ | ### rectangle with hole | ||
+ | ### radius on corners | ||
+ | ### fiberglass tape half-lapped | ||
+ | ### B-stage is pre-impregnated tape vs. just tape | ||
+ | ### w/ latter back-fill with epoxy | ||
+ | ### former does not make a monolithic structure | ||
+ | ### ground wrap after | ||
+ | ## JLAB job, admin by JLAB | ||
# Other priorities | # Other priorities | ||
+ | ## Sensitivities | ||
+ | ## segmented coil | ||
Return to [[Teleconferences]]<br> | Return to [[Teleconferences]]<br> | ||
Return to [[MOLLER at 11 GeV E09-005]] | Return to [[MOLLER at 11 GeV E09-005]] |
Revision as of 16:15, 31 January 2018
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 734 609 7559 Bluejeans link: https://bluejeans.com/7346097559
Agenda
- Status reports
Minutes
Attendance: Juliette, KK, Cameron, Ernie, Jim, Rakitha
- Prototype coil
- water test plumbed incorrectly
- shipping on winding device
- B-stage - stuck together turn-to-turn when moved to vacuum chamber
- rectangle with hole
- radius on corners
- fiberglass tape half-lapped
- B-stage is pre-impregnated tape vs. just tape
- w/ latter back-fill with epoxy
- former does not make a monolithic structure
- ground wrap after
- JLAB job, admin by JLAB
- Other priorities
- Sensitivities
- segmented coil
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005