Difference between revisions of "Wednesday, January 31, 2018 3:00pm ET"

From Hall A Wiki
Jump to: navigation, search
(Minutes)
(Minutes)
Line 14: Line 14:
 
Attendance: Juliette, KK, Cameron, Ernie, Jim, Rakitha<br>
 
Attendance: Juliette, KK, Cameron, Ernie, Jim, Rakitha<br>
 
# Prototype coil
 
# Prototype coil
*
+
## water test plumbed incorrectly
 +
## shipping on winding device
 +
## B-stage - stuck together turn-to-turn when moved to vacuum chamber
 +
### rectangle with hole
 +
### radius on corners
 +
### fiberglass tape half-lapped
 +
### B-stage is pre-impregnated tape vs. just tape
 +
### w/ latter back-fill with epoxy
 +
### former does not make a monolithic structure
 +
### ground wrap after
 +
## JLAB job, admin by JLAB
 
# Other priorities
 
# Other priorities
 +
## Sensitivities
 +
## segmented coil
  
 
Return to [[Teleconferences]]<br>
 
Return to [[Teleconferences]]<br>
 
Return to [[MOLLER at 11 GeV E09-005]]
 
Return to [[MOLLER at 11 GeV E09-005]]

Revision as of 16:15, 31 January 2018

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                    734 609 7559
 Bluejeans link: https://bluejeans.com/7346097559

Agenda

  1. Status reports

Minutes

Attendance: Juliette, KK, Cameron, Ernie, Jim, Rakitha

  1. Prototype coil
    1. water test plumbed incorrectly
    2. shipping on winding device
    3. B-stage - stuck together turn-to-turn when moved to vacuum chamber
      1. rectangle with hole
      2. radius on corners
      3. fiberglass tape half-lapped
      4. B-stage is pre-impregnated tape vs. just tape
      5. w/ latter back-fill with epoxy
      6. former does not make a monolithic structure
      7. ground wrap after
    4. JLAB job, admin by JLAB
  2. Other priorities
    1. Sensitivities
    2. segmented coil

Return to Teleconferences
Return to MOLLER at 11 GeV E09-005