− | === Status of the INFN GEM Cosmic Stand === | + | === Status of the INFN GEM Cosmic Stand (Roberto) === |
*Provide the FNAL Test beam update. | *Provide the FNAL Test beam update. |
Revision as of 11:14, 20 March 2018
Link to all previous meetings: https://wiki.bnl.gov/eic/index.php/Eic-rd-meeting
Kondo, Evaristo, Roberto, Siyu, Bogdan, Nilanga, Leo
Status of the INFN GEM Cosmic Stand (Roberto)
- Provide the FNAL Test beam update.
- They completed a scan of the multi-ZZ pattern PCB, along with gain and gap field scans.
- Have other ZZ boards we want to test as well, including micromegas based detectors with ZZ readout.
- Overall things are going well. They will report more in two weeks.
Status of the UVa GEM Cosmic Stand
- They receive the new longer screws, will prepare them (cleaning etc ...) for assembly.
- Will put the mock chamber together once more this week to check if gas leak issue is fixed with the longer screws