Difference between revisions of "APEX Run Preparation List"

From Hall A Wiki
Jump to: navigation, search
(New page: =Planning and Documentation= * Comissioning and Calibration Plans ** Septum current selection ** Shift beam checkout procedures with target ** Optics * Shift page * Authorship and shift re...)
 
(Target)
Line 8: Line 8:
  
 
=Target=
 
=Target=
** Establishing parallel beam optics (Yves Roblin)
+
* Establishing parallel beam optics (Yves Roblin)
 +
* OSP (Silviu)
  
 
=DAQ=
 
=DAQ=

Revision as of 13:34, 18 June 2018

Planning and Documentation

  • Comissioning and Calibration Plans
    • Septum current selection
    • Shift beam checkout procedures with target
    • Optics
  • Shift page
  • Authorship and shift requirements

Target

  • Establishing parallel beam optics (Yves Roblin)
  • OSP (Silviu)

DAQ

  • Establishing coincident timing alignment for trigger (scintillator and Cerenkov)
  • Checkout with cosmics

Scifi

  • Present state tested and operational?
  • Cabling and patch panels ready
  • Commissioning plans
  • Development of online, offline analysis software
  • Slow controls
    • Integration with existing HV system
    • Stepper motor

Software

  • Reestablish online scripts and replay libraries
    • Integrate new scifi
  • Procedures written for shift crew

Septum

  • Identify power supply and integrate to slow controls
  • Corrector magnet construction (Hall A engineering)

VDC

  • HV adjustments for drain currents
  • Resistor modification

Raster

  • Analysis with new FADC readout (has been done for prior experiments)