Difference between revisions of "Meeting 2019 03 28"
From Hall A Wiki
(→Update on UVa GEM commissioning (Kondo)) |
(→Update HDMI cable tests (Tongtong)) |
||
Line 22: | Line 22: | ||
=== Update HDMI cable tests (Tongtong) === | === Update HDMI cable tests (Tongtong) === | ||
− | * | + | * |
=== Update on Logbook ELOG and activities in EEL Clean room (Malinga) === | === Update on Logbook ELOG and activities in EEL Clean room (Malinga) === |
Revision as of 09:06, 28 March 2019
GMn GEM commissioning Meetings: Thursday 9:00am - 10:00pm
Link to all previous meetings: GMn GEM Commissioning Meeting
Kondo, ...
Contents
Update on UVa GEM commissioning (Kondo)
- Short update
- Status of the HDMI cables: Short cables (1m, 2m, 3m) delivered == still testing the long cables. - we will procure a set of long cheap (UVa cables) for the second layer and and a few MONOPRICE cables to test on one module .. - HV test OK for the module with gas connector fix: - Drawing of the backplanes support on the Alu frames: 20190324 sketch backplane support.pdf - Modification of the GEM frames to make clearance for plastic screws supporting the divider.20190326_ClearanceHolesInFramesForVince.pdf The job is with the Machine shop - Identify with Bogdan some counters that we will use to trigger our cosmics - Need someone for the test of the divider and PMT for these modules with the help from Bogdan -