Difference between revisions of "Wednesday, May 8, 2019, 11:00 am EDT"
From Hall A Wiki
(Created page with "Back to Main Compton Page >> Compton Meetings <pre> *********BLUEJEANS CALL-IN INSTRUCTIONS********* --------------------------------...") |
(→Photon Detector) |
||
Line 27: | Line 27: | ||
=== Photon Detector === | === Photon Detector === | ||
* GSO detector status | * GSO detector status | ||
+ | ** Have a PMT+Base for PREX (-0.15% diff non-lin at CE) | ||
+ | ** May already have identified suitable spare PMT+Base (+0.3% diff non-lin at CE) | ||
* DAQ status | * DAQ status | ||
Revision as of 10:58, 8 May 2019
Back to Main Compton Page >> Compton Meetings
*********BLUEJEANS CALL-IN INSTRUCTIONS********* ---------------------------------------------------- 1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada) 2. International participants dial: Toll Number: 1-408-740-7256 3. Enter meeting ID:140287970 Desktop sharing: https://bluejeans.com/140287970
Contents
Agenda
Meeting room= F227 in Cebaf Center
General
- Schedule
Laser
- Laser update
- HWP angle offset
- Locked cavity measurements
- 10 W fiber amp update
Photon Detector
- GSO detector status
- Have a PMT+Base for PREX (-0.15% diff non-lin at CE)
- May already have identified suitable spare PMT+Base (+0.3% diff non-lin at CE)
- DAQ status
Simulation
- Updates
Electron detector
- Update on test plans
- Signal amplification
- Diamond
- HVMAPS