Difference between revisions of "2009 Holiday Schedule"
From Hall A Wiki
(New page: == Dec 22, 2008 == # Polarization calibration: EPR, NMR, Temperature # Polarization loss test # HRS Magnet effect test: requires turning ON/OFF magnets for a couple of times # Check laser...) |
|||
Line 1: | Line 1: | ||
− | == Dec 22, 2008 == | + | == Dec 22, Monday, 2008 == |
# Polarization calibration: EPR, NMR, Temperature | # Polarization calibration: EPR, NMR, Temperature | ||
Line 6: | Line 6: | ||
# Check laser spectrum with cell | # Check laser spectrum with cell | ||
# Cool down oven | # Cool down oven | ||
+ | |||
+ | == Dec 23, Tuesday, 2008 == | ||
+ | |||
+ | # RadCon surveys the target enclosure | ||
+ | # remove the 3He cell and target ladder | ||
+ | # Install water cell | ||
+ | # Prepare for water calibration: require turning off pump, other environment noise. | ||
+ | # Water calibration | ||
+ | |||
+ | == Dec 24, Wednesday, 2008 == | ||
+ | |||
+ | # Water calibration | ||
+ | |||
+ | == Dec 25, Thursday, 2008 - Jan 4, Sunday, 2009 == | ||
+ | |||
+ | # Compass measurement: Transverse, Vertical (optional) | ||
+ | |||
+ | == Jan 5, Monday, 2009 == | ||
+ | |||
+ | # Compass survey | ||
+ | # Install 3He cell and ladder | ||
+ | |||
+ | == Jan 6, Tuesday, 2009 == | ||
+ | |||
+ | # Target Survey | ||
+ | |||
+ | == Jan 7, Tuesday, 2009 - Beam start == | ||
+ | |||
+ | # Laser check | ||
+ | # Pumping | ||
+ | # Polarization calibration |
Revision as of 16:53, 10 December 2008
Contents
Dec 22, Monday, 2008
- Polarization calibration: EPR, NMR, Temperature
- Polarization loss test
- HRS Magnet effect test: requires turning ON/OFF magnets for a couple of times
- Check laser spectrum with cell
- Cool down oven
Dec 23, Tuesday, 2008
- RadCon surveys the target enclosure
- remove the 3He cell and target ladder
- Install water cell
- Prepare for water calibration: require turning off pump, other environment noise.
- Water calibration
Dec 24, Wednesday, 2008
- Water calibration
Dec 25, Thursday, 2008 - Jan 4, Sunday, 2009
- Compass measurement: Transverse, Vertical (optional)
Jan 5, Monday, 2009
- Compass survey
- Install 3He cell and ladder
Jan 6, Tuesday, 2009
- Target Survey
Jan 7, Tuesday, 2009 - Beam start
- Laser check
- Pumping
- Polarization calibration