Re-install crash buttons in Hall A Counting Room - <s>RQ1 button for BB</s> and new ones for SBS supply and correctors
+
== Priority Items ==
  
Swap out MFCs in VDC mixing system
+
Hall A Moller Polarimeter target magnet re-install: target install and survey, compressor and chiller clean up and setup, testing
  
Remove three Oxford power supplies from HMS
+
Low voltage connections for BB detectors
  
<s>HMS Q2 lead voltage drops</s> Done
+
Controls for SBB and corrector coils
  
Heaters for SHMS magnet flags./ Guard modifications complete, waiting on controller
+
Re-tap the SBB supply main transformer for full power
  
Hall A cooldown./Done
+
Connect 480VAC for SBB and corrector power supplies
  
Heaters for HMS magnet flags-Heaters, modifications to guards complete, heaters installed.  Waiting on controller.
+
Install magnet leads for SBB (535 MCM cable)
  
Help Brad re-configure the DAQ rack in Counting Room C
+
Install magnet leads for SBB corrector magnets (2 AWG welding cable)
  
Swap out CAEN HV crate in Counting Room C
+
Connect SBB and corrector magnets to FSD
 
+
Controls for SBS corrector coils
+
 
+
Re-tap the SBS supply main transformer for full power
+
  
 
re-install ground fault detector in LQ1 supply - requires configuration of module
 
re-install ground fault detector in LQ1 supply - requires configuration of module
Line 25: Line 21:
 
connect power and LCW to BB supply on R-arm platform
 
connect power and LCW to BB supply on R-arm platform
  
Replace air compressor in Hall A Gas Shed
+
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (Steve).
  
re-locate displays for hacweb11 and 14
+
Gas manifolds for GEM gas cylinders
  
clean up R-arm supply platform
+
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller)
  
clean up L-arm supply platform
+
Gas mix controller and MFCs for GEM detectors
  
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (Steve).
+
Readout for LCW pressure sensors added at end of beamline walkway
 +
 
 +
Re-install crash buttons in Hall A Counting Room - <s>RQ1 button for BB</s> and new ones for SBS supply and correctors
 +
 
 +
 
 +
== Would Be Good To Do Items ==
 +
 
 +
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker
  
 
Remove actuators from right arm magnets. (Dipole complete)
 
Remove actuators from right arm magnets. (Dipole complete)
  
<s>HMS supply control boxes into the Shield Hut</s> Done
+
clean up R-arm supply platform
  
Gas mix controller for GEM detectors
+
clean up L-arm supply platform
  
<s>Fix relay box for HMS counting room E-Stops</s> Done
+
Swap out MFCs in VDC mixing system
  
Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker
+
Remove three Oxford power supplies from HMS
  
Readout for LCW pressure sensors added at end of beamline walkway
+
Heaters for SHMS magnet flags./ Guard modifications complete, waiting on controller
  
Remote reset for Hall C spectrometer motion
+
Heaters for HMS magnet flags-Heaters, modifications to guards complete, heaters installed.  Waiting on controller.
  
Install new quench protection boards in Hall A LD1
 
  
<s>Reconnect Magnet On signs to the HMS supplies</s> Done
 
  
Hall A moller re-install: target install and survey, compressor and chiller clean up and setup, testing
+
== Possible Future Items ==
  
Connect beamline magnets to FSD
+
Replace air compressor in Hall A Gas Shed (on hold till next fiscal year)
  
Move SHMS lead flow controllers/Done
+
Remote reset for Hall C spectrometer motion (maybe next year)

Revision as of 15:36, 14 August 2021

Priority Items

Hall A Moller Polarimeter target magnet re-install: target install and survey, compressor and chiller clean up and setup, testing

Low voltage connections for BB detectors

Controls for SBB and corrector coils

Re-tap the SBB supply main transformer for full power

Connect 480VAC for SBB and corrector power supplies

Install magnet leads for SBB (535 MCM cable)

Install magnet leads for SBB corrector magnets (2 AWG welding cable)

Connect SBB and corrector magnets to FSD

re-install ground fault detector in LQ1 supply - requires configuration of module

connect power and LCW to BB supply on R-arm platform

Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (Steve).

Gas manifolds for GEM gas cylinders

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller)

Gas mix controller and MFCs for GEM detectors

Readout for LCW pressure sensors added at end of beamline walkway

Re-install crash buttons in Hall A Counting Room - RQ1 button for BB and new ones for SBS supply and correctors


Would Be Good To Do Items

Re-locate NDX detectors in Hall A - one in DAQ bunker and the other in BB GEM bunker

Remove actuators from right arm magnets. (Dipole complete)

clean up R-arm supply platform

clean up L-arm supply platform

Swap out MFCs in VDC mixing system

Remove three Oxford power supplies from HMS

Heaters for SHMS magnet flags./ Guard modifications complete, waiting on controller

Heaters for HMS magnet flags-Heaters, modifications to guards complete, heaters installed. Waiting on controller.


Possible Future Items

Replace air compressor in Hall A Gas Shed (on hold till next fiscal year)

Remote reset for Hall C spectrometer motion (maybe next year)