Difference between revisions of "September 10th 2021"

From Hall A Wiki
Jump to: navigation, search
Line 1: Line 1:
 
*Updates
 
*Updates
 +
**Rate tests
 +
***[[File:https://logbooks.jlab.org/files/styles/plentybig/public/2021/09/3902471/snapshot_1.png?itok=9DijQCMd]]
 +
***[[File:https://logbooks.jlab.org/files/styles/plentybig/public/2021/09/3902522/snapshot_1.png?itok=IhRkkqnc]]
 +
***[[File:https://logbooks.jlab.org/files/styles/plentybig/public/2021/09/3903660/snapshot_1.png?itok=ara73TAO]]
 
**HCAL
 
**HCAL
 
**Bigbite Shower
 
**Bigbite Shower
Line 10: Line 14:
 
**HV
 
**HV
 
**RF
 
**RF
 +
***plug in FADC ?
 +
***can add F1 TDC
 
**Helicity
 
**Helicity
 +
  
  
 
*On going tasks
 
*On going tasks
 
**Cable to weldment ( Jack ? )
 
**Cable to weldment ( Jack ? )
**cabling scaler/beamline crate ( David , Bob )
+
**cabling scaler/beamline crate ( David , Bob 0%)
**HRS to TS and timing ( Bob, Maria )
+
**HRS to TS and timing ( Bob, Maria 0% )
**EPICS / start End of run logging script (Alex, Bob )
+
**EPICS / start End of run logging script (Alex, Bob 0% 09/15 )
 
**script check MPD sync ( Ben , Andrew )
 
**script check MPD sync ( Ben , Andrew )
**RF prescale (Alex, Bob )
+
**RF (Alex, Bob )
 
**sync check scripts ( Andrew , Alex )
 
**sync check scripts ( Andrew , Alex )
 
**Hodoscope v1190 clock ( Alex , Mark )
 
**Hodoscope v1190 clock ( Alex , Mark )
 
**Full configration all crates ( Alex, Bryan )
 
**Full configration all crates ( Alex, Bryan )
**data rate test with new computer and 3 VTPs ( Alex, Bryan 0% 09)
+
**data rate test with new computer and 3 VTPs ( Alex, Bryan )
 
**test GEM zero supression ( Sean, Holly )
 
**test GEM zero supression ( Sean, Holly )
 
**GEM cosmics ( Sean, Holly )
 
**GEM cosmics ( Sean, Holly )
Line 33: Line 40:
 
**suggest taking all detectors cosmics every night
 
**suggest taking all detectors cosmics every night
 
**add scaler crate to full config
 
**add scaler crate to full config
 +
**coincidence trigger
 +
**EDTM
  
 
*Issues
 
*Issues

Revision as of 10:22, 10 September 2021


  • On going tasks
    • Cable to weldment ( Jack ? )
    • cabling scaler/beamline crate ( David , Bob 0%)
    • HRS to TS and timing ( Bob, Maria 0% )
    • EPICS / start End of run logging script (Alex, Bob 0% 09/15 )
    • script check MPD sync ( Ben , Andrew )
    • RF (Alex, Bob )
    • sync check scripts ( Andrew , Alex )
    • Hodoscope v1190 clock ( Alex , Mark )
    • Full configration all crates ( Alex, Bryan )
    • data rate test with new computer and 3 VTPs ( Alex, Bryan )
    • test GEM zero supression ( Sean, Holly )
    • GEM cosmics ( Sean, Holly )
    • Shower cosmics (Arun, Provokar )
    • HCAL cosmics (Scott)
    • GRINCH cosmics ( Bradley )
    • Hodoscope cosmics ( Ralph )
    • DAQ documentation ( Alex, Rachel )
    • suggest taking all detectors cosmics every night
    • add scaler crate to full config
    • coincidence trigger
    • EDTM
  • Issues
    • Shower FADC bad channel
    • HCAL ROC16 fiber
    • warning PEB ROC
    • Shower F1 issue at high rate
  • Status software in a-onl@aonl1
  • GRINCH
    • still need to install - need to check if commits were merged
    • still running locally -
  • Shower
    • installed
    • one script working with TS files
  • GEM
    • Andrew still need to set it up there
  • Hodoscope
    • installed
  • HCAL
    • setup and can look at data


  • All crates
  • Bigbite config : GEM GRINCH Hodoscope
  • need add HCAL and HRS