(Created page with " *On going tasks **Cable to weldment ( Jack ? ) **cabling scaler/beamline crate ( David , Bob 0%) **HRS to TS and timing ( Bob, Maria 0% ) **EPICS / start End of run logging...")
 
Line 1: Line 1:
 
+
*Updates
 
+
**HCal
 +
**Bigbite Shower
 +
**Hodoscope
 +
**GRINCH
 +
**CDet
 +
**GEM Bigbite INFN
 +
**GEM Bigbite UVA
 +
**GEn RP chamber
  
 
*On going tasks
 
*On going tasks

Revision as of 10:29, 17 September 2021

  • Updates
    • HCal
    • Bigbite Shower
    • Hodoscope
    • GRINCH
    • CDet
    • GEM Bigbite INFN
    • GEM Bigbite UVA
    • GEn RP chamber
  • On going tasks
    • Cable to weldment ( Jack ? )
    • cabling scaler/beamline crate ( David , Bob 0%)
    • HRS to TS and timing ( Bob, Maria 0% )
    • EPICS / start End of run logging script (Alex, Bob 0% 09/15 )
    • script check MPD sync ( Ben , Andrew ) - is new firmware ready ?
    • RF (Alex, Bob ) - located RF prescaler and signal - need to send to HRS and SBS weldment
    • sync check scripts ( Andrew , Alex )
    • Hodoscope v1190 clock ( Alex , Mark , Ralph)
      • check if calibration is needed after switch
    • Full configration all crates ( Alex, Bryan )
    • data rate test with new computer and 3 VTPs ( Alex, Bryan )
    • test GEM zero supression ( Sean, Holly )- done
    • GEM cosmics ( Sean, Holly )
    • Shower cosmics (Arun, Provokar )
    • HCAL cosmics (Scott)
    • GRINCH cosmics ( Bradley )
    • Hodoscope cosmics ( Ralph )
    • DAQ documentation ( Alex, Rachel )
    • suggest taking all detectors cosmics every night
    • add scaler crate to full config
    • coincidence trigger (done ? )
    • EDTM (done ? )
    • BB CAL and HCAL at TS - delayed after coincidence
    • reference channel to all crates
    • Final CODA config
    • add FADCs for shower sum
    • add FADCs for GRINCH and HODO
    • timing hodoscope - V792 gate
  • Issues
    • network issue : one short fiber replaced, will try to put in protective tube
    • LHRS
    • GEM with TS hanging - need to check
    • Shower FADC bad channel - FADC replaced but problem could not be reproduce - need to test more
    • HCAL FADC bad channel
    • HCAL ROC16 fiber - will double check if fiber 5 enabled - use slave5 - added additionnal fiber for ROC16
    • warning PEB ROC - Bryan checking with Dave - might incorrect flag -
    • Shower F1 issue at high rate - need to check with OT#2 - check at sync event implemented - DMA error might come from multiple pulsing - might
      • Helicity scaler readout
  • Status software in a-onl@aonl1
  • GRINCH
    • still need to install - need to check if commits were merged
    • still running locally -
  • Shower
    • installed
    • one script working with TS files
  • GEM
    • Andrew tried already
  • Hodoscope
    • installed
  • HCAL
    • setup and can look at data