(Created page with "*Updates **HCal **Hodoscope ***working - no particular ***plan for HV alarms - take unused board and try restarting EPICS **GRINCH **CDet ***almost finished with last cosmic...")
 
Line 3: Line 3:
  
 
**Hodoscope
 
**Hodoscope
***working - no particular
+
 
***plan for HV alarms - take unused board and try restarting EPICS
+
 
**GRINCH
 
**GRINCH
 
**CDet
 
**CDet
***almost finished with last cosmic for efficiency analysis
 
***next week second half
 
 
**GEM Bigbite
 
**GEM Bigbite
 
***GEM working
 
***GEM working
***J0 MPD and APV
 
 
**GEM INFN clean room
 
**GEM INFN clean room
***taking cosmics
 
 
**Helicity  
 
**Helicity  
 
**GEN RP
 
**GEN RP
***bug in VTP stack in GEn RP - crash DAQ with full event
 
***same bug in Hall A - primary event builder - data corruption
 
 
**beamline
 
**beamline
***helicity decoder board - would give the seed for reported helicity for the trigger
 
***feedback ?
 
***could try take time setup PITA - beam charge asymmetries to check system, prompt and delayed
 
**Beamline/scalers
 
***David working on BCM/ unser analysis
 
***Charge script by Bob
 
 
**HV
 
**HV
***Rpi on remote switch
 
***send instruction to Steve on how to reboot RPis
 
***Steve will put a SBS EPICS page on wiki, want to add instructions
 
***hodoscope HV uses proprietary CAEN library ( radiation or too much traffic  ) suggest to pull out unused cards to reduce traffic
 
  
  
Line 45: Line 28:
 
***Possible new tasks
 
***Possible new tasks
 
****User event inserted at each split with timestamp, spectrometer information - should discuss with  
 
****User event inserted at each split with timestamp, spectrometer information - should discuss with  
****autoanalysis at end of run - ( Paul has something setup 75 % but still need to be tested ) some issues launching jobs automatically - could have 3, one on each machine - not priority
 
- still issues with non interactive shell - could try for next production
 
 
****setup laptop for CH blujeans and Slack - need fix hard drive
 
****setup laptop for CH blujeans and Slack - need fix hard drive
 
**filling up google sheet with run info
 
**filling up google sheet with run info
Line 52: Line 33:
  
 
*Unresolved issue
 
*Unresolved issue
**Scaler gating ( need cable and go through TTL/ECL converter ) (fixed)
 
**TI shower in William office (fixed)
 
 
**(need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal
 
**(need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal
 
**(still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue
 
**(still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue
Line 59: Line 38:
 
**(50%) near 100 MB/s limit for FADC crates - Shower window was divided by 2  - HCal windows - could do 150 ns - Move FADCs to top crate ? - can reach 5.2 KHz now
 
**(50%) near 100 MB/s limit for FADC crates - Shower window was divided by 2  - HCal windows - could do 150 ns - Move FADCs to top crate ? - can reach 5.2 KHz now
 
**(cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation
 
**(cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation
** (fixed ) EPICS insertion : working better but still hangs for long runs
 
** (other issues ) ROC19 busy fiber : issue became worse - MPD23 disabled - firmware fixes to be implemented for reset -
 
**(new) ER1 hangup - related to ET issue - VTP can get stuck - resetting run usually fixes
 
**(new) TDC errors - just one run though - https://logbooks.jlab.org/entry/3923168
 
**(new)HCAL flag file crashing ROCs : file too long ? - max file length to add -
 
**(fixed) Raster saturation ( fixed with 20 db attenuator ) -
 
 
**No clear signal in GRINCH - latency was adjusted - need check with beam ( see signal now )
 
**No clear signal in GRINCH - latency was adjusted - need check with beam ( see signal now )
**HCAL fifo overflow https://logbooks.jlab.org/entry/3925327 - will check HCal people ( maybe empty channels - trigger info )
 
**(new) issue with 50 k scripts making entry - logentry script puts a limit on java memory - 50 k and 5 k scripts were changed to use it - might want to use this new script to avoid issues - HALOG from Paul -
 
Logentry script:  https://logbooks.jlab.org/entry/3933875 - is that a ulimit issue ?
 
 
*3820 scalers : issue to address - will get more as spare - and need -  
 
*3820 scalers : issue to address - will get more as spare - and need -  
*tftp issue (fixed): network - switch transceiver
+
* 75 ns timing shift
* (new) 75 ns timing shift
+
 
*( new) DAQ running with APV and MPD in bad state
 
*( new) DAQ running with APV and MPD in bad state
*disk filling up
 
*helicity with several streams
 
  
  
 
GEn RP
 
GEn RP
 
*GEN RP DAQ
 
*GEN RP DAQ
**both VTP working : 10 gigE link from VTP to computer
 
**working on VTP update to handle more that 32 MPDs
 
**debugging fiber connection
 
**will bring VME crate
 
**new MPD might arrive for Thanksgiving : 15 MPDs
 
**new distribution box ready
 
**received lemo cables
 
**GEM layers can see clusters and cosmics
 
**still DAQ very unstable
 
  
**enpcamsonne cannot ssh out,
+
 
 +
*To do list
 +
**Must
 +
***timing diagram, diagnostic time shift
 +
***fix bad APVs
 +
 
 +
**Like
 +
***VETROC HCAL
 +
***Shower FADC trigger
 +
***HCAL FADC trigger

Revision as of 11:10, 17 December 2021

  • Updates
    • HCal
    • Hodoscope
    • GRINCH
    • CDet
    • GEM Bigbite
      • GEM working
    • GEM INFN clean room
    • Helicity
    • GEN RP
    • beamline
    • HV


  • On-going tasks
    • EPICS / start End of run logging script (fixed Bob 100% ) - just need to add configuration - will make a test configuration - need to make sure we have all variables - and variables to add at begining / end of run and during the run (EPICS 131 event - need to add to analyzer ) issue with ET - could try run ER and EB on same node - way to restart ET ?
      • Carl looking at issues still unresolved - ER and ET communication - code updated - might fix issues - could try to update emu and ET to test
    • (fixed database issue 100% working ) David readout scalers fine and are in tree - from LHRS - still need SBS side will check with Steve - ( done - looks good on sbs side )
    • script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work - ( event count aligned, timestamp look odd maybe will check with Andrew )
    • sync check scripts other modules F1, 1190, FADC ( Andrew , Alex, Mark 20%) - Mark will work to have it available
    • reference channel to all crates - need HCal and Shower + RF - need to add RF to HCAL - 3 cables - in hodoscope crate - if shower FADC available can add

separate - need RC box for shower and hodo if possible - need to check - module will be added ( Mark )

    • Trigger latch TS to TDC ( Bob,Ole 100 % ) - trigger bank has latch
    • event type decoding in analyzer - ( done 100% ) - need update CH analyzer
      • Possible new tasks
        • User event inserted at each split with timestamp, spectrometer information - should discuss with
        • setup laptop for CH blujeans and Slack - need fix hard drive
    • filling up google sheet with run info


  • Unresolved issue
    • (need to test)FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority ) - FADC in test lab - DAQ setup - need to feed signal
    • (still there)warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue
    • HV can put documentation for other non EPICS control
    • (50%) near 100 MB/s limit for FADC crates - Shower window was divided by 2 - HCal windows - could do 150 ns - Move FADCs to top crate ? - can reach 5.2 KHz now
    • (cannot be fixed - been that way forever) Raster X1 vs Raster X2 anticorrelation
    • No clear signal in GRINCH - latency was adjusted - need check with beam ( see signal now )
  • 3820 scalers : issue to address - will get more as spare - and need -
  • 75 ns timing shift
  • ( new) DAQ running with APV and MPD in bad state


GEn RP

  • GEN RP DAQ


  • To do list
    • Must
      • timing diagram, diagnostic time shift
      • fix bad APVs
    • Like
      • VETROC HCAL
      • Shower FADC trigger
      • HCAL FADC trigger