Difference between revisions of "Meeting 2022 04 27"
From Hall A Wiki
(→Near term work plan (all)) |
(→Near term work plan (all)) |
||
Line 9: | Line 9: | ||
* Installation of HV dividers on BB: [https://docs.google.com/document/d/1yWlczu0QHQhMazwHK28gOAQgrXmz5YY5/edit#heading=h.gjdgxs work plan] | * Installation of HV dividers on BB: [https://docs.google.com/document/d/1yWlczu0QHQhMazwHK28gOAQgrXmz5YY5/edit#heading=h.gjdgxs work plan] | ||
** [https://docs.google.com/spreadsheets/d/1QGkJZEgs3Uel5TfvR5iCwstGbNRv8rCM_hfFXXwRf2o/edit?usp=sharing BB APV Status] | ** [https://docs.google.com/spreadsheets/d/1QGkJZEgs3Uel5TfvR5iCwstGbNRv8rCM_hfFXXwRf2o/edit?usp=sharing BB APV Status] | ||
− | |||
* Thoughts on special run requests during GEn: | * Thoughts on special run requests during GEn: | ||
** Luminosity studies (Nilanga) | ** Luminosity studies (Nilanga) |
Revision as of 10:26, 27 April 2022
GMn GEM commissioning Meetings: WEDNESDAY 10:30am - 11:30am
Link to all previous meetings: GMn GEM Commissioning Meeting
Please use sbs_gems mailing list for plots/communications and HALOG entries relevant to GEMs!
Contents
Near term work plan (all)
- Installation of HV dividers on BB: work plan
- Thoughts on special run requests during GEn:
- Luminosity studies (Nilanga)
- Full readout studies for negative pulse studies and etc (Sean)
Update on INFN GEM layers for GEn-RP (Ezekiel, Holly, Evaristo)
Update on UVa GEM layers for GEn-RP (Anu, John, Thir)
Update on BB GEMs(Sean, Ezekiel, Holly, Anu)
- UV layers 3 and 4 (counting 1 - 4) had dividers replaced with new 2-path divider boards
- Both had HV tests and everything went as expected.
- APVs with missing strips were replaced on both layers.
- All layers are now installed back into BB and we are waiting for parts to take out layer 1 and install the parallel HV supply.
DAQ updates (Ben, Bryan, Alex)
- schematic of setup?
- FIR filter?
- Update on: need 2 DC working in Hall A