Readout for LCW pressure sensors added at end of beamline walkway (not started)
 
Readout for LCW pressure sensors added at end of beamline walkway (not started)
 
Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen
 
 
Buy and replace MFCs in old FPP mixing system - MFCs on order
 
  
 
Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.
 
Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.
  
 
Gas manifolds for GEM gas cylinders (started)
 
Gas manifolds for GEM gas cylinders (started)
 
Replacement for EEL two cylinder gas cart - ordered, waiting on delivery
 
 
Hall C Moller: setup new chiller, modify bertha, get new helium lines installed when they come in and test magnet cooldown
 
  
 
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
 
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
  
 
Gas mix controller and MFCs for GEM detectors (not started)
 
Gas mix controller and MFCs for GEM detectors (not started)
 
Warm up HB.-Done
 
  
 
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.
 
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.
 
Add ventilation to SHMS Dipole flow meter shielding.-Done
 
 
Find 4 atmos leak in Hall C.-In Hall snoop of lines and isolation done.
 
  
 
Move ozone meters from VME to PI.
 
Move ozone meters from VME to PI.
 
Add fan to beamline side lead (HB)-Done
 
 
Modify HMS lead heaters, add perforated sheets up stream and add a perforated box downstream to fit heater.-Done
 
  
 
== Would Be Good To Do Items ==
 
== Would Be Good To Do Items ==
Line 41: Line 23:
 
clean up L-arm supply platform
 
clean up L-arm supply platform
  
HMS/SHMS Heater and fan changes, fixes, upgrades etc.-Done
+
Build new controller for testing and calibration warm return valves for Hall C
 
+
Calibrate and op-check spare warm return valves for Hall C.-Done- new controller for testing and calibration being built.
+
 
+
Add bypass switch for SHMS UPS - Switch ordered-Done.
+
  
 
Build local valve control boxes with local read out.
 
Build local valve control boxes with local read out.
 
Build new controller for warm return valves.
 
  
 
op check/repair hall C vacuum gauges.
 
op check/repair hall C vacuum gauges.

Revision as of 10:12, 26 July 2022

Priority Items

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Replace air compressor in Hall A Gas Shed - ordered - need to remove old compressor and dryer.

Gas manifolds for GEM gas cylinders (started)

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.

Move ozone meters from VME to PI.

Would Be Good To Do Items

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

Build new controller for testing and calibration warm return valves for Hall C

Build local valve control boxes with local read out.

op check/repair hall C vacuum gauges.

Do We Still Need To Do These?

Possible Future Items

Remote reset for Hall C spectrometer motion (maybe next year)