Difference between revisions of "Compton DAQ Dev"

From Hall A Wiki
Jump to: navigation, search
(Basic Setup)
Line 5: Line 5:
  
 
== [[Basic Setup]] ==
 
== [[Basic Setup]] ==
 +
 +
R. Michaels  Oct 12, 2022
 +
 +
Here are some notes on the project of developing the Compton
 +
counting mode DAQ.  The original work was done mainly by
 +
Bryan Moffit and Ben Raydo in 2020, with input from others.
 +
 +
It is foreseen to be a precurse of a moller polarimeter DAQ
 +
and a counting-mode DAQ for the MOLLER project, etc.
 +
 +
The basic configuration is here:
 +
 +
DAQ config: haVTP_config.png
 +
ROC1 setup: roc1_config.png
 +
VTP setup: vtpROC_config.png
 +
 
== [[How to Run]] ==
 
== [[How to Run]] ==
 
== [[Current Problems]] ==
 
== [[Current Problems]] ==
 
== [[Analysis Software]] ==
 
== [[Analysis Software]] ==

Revision as of 11:33, 12 October 2022

Project to Develop a DAQ for the Compton

See earlier work https://hallaweb.jlab.org/wiki/index.php/Compton_Counting_DAQ_Software_HOWTO

Basic Setup

R. Michaels Oct 12, 2022

Here are some notes on the project of developing the Compton counting mode DAQ. The original work was done mainly by Bryan Moffit and Ben Raydo in 2020, with input from others.

It is foreseen to be a precurse of a moller polarimeter DAQ and a counting-mode DAQ for the MOLLER project, etc.

The basic configuration is here:

DAQ config: haVTP_config.png ROC1 setup: roc1_config.png VTP setup: vtpROC_config.png

How to Run

Current Problems

Analysis Software