Difference between revisions of "ERR"
From Hall A Wiki
(→Agenda) |
(→Agenda) |
||
Line 19: | Line 19: | ||
| 8:30 || '''Charge item 1''': The status of the equipment required for this experiment ([https://hallaweb.jlab.org/wiki/images/6/6c/GEp-ERR_overview.pdf '''pdf''']) || BogdanW (10+10) | | 8:30 || '''Charge item 1''': The status of the equipment required for this experiment ([https://hallaweb.jlab.org/wiki/images/6/6c/GEp-ERR_overview.pdf '''pdf''']) || BogdanW (10+10) | ||
|- | |- | ||
− | | 8:50 || '''Charge Items 1b | + | | 8:50 || '''Charge Items 1b, 2a''': SBS GEM tracker (['''pdf''']). || Nilanga Liyanage, Holly Szumila-Vance (20+10) |
|- | |- | ||
− | | 9:20 || '''Charge | + | | 9:20 || '''Charge Items 1c, 2b, and 5''': The simulation and data analysis software status for the experiment (['''pdf''']) || Andrew Puckett (20+10) |
|- | |- | ||
− | | 9: | + | | 9:50 || '''Charge Item 3''': The responsibilities, manpower and other resources (['''pdf''']) || Mark Jones (10+10) |
|- | |- | ||
|10:10 || '''Break''' || (20) | |10:10 || '''Break''' || (20) | ||
|- | |- | ||
− | |10:30 || '''Charge | + | |10:30 || '''Charge Item 4''': The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations ([https://hallaweb.jlab.org/wiki/images/7/79/ERR_-_SBS_GEp_Installation.pdf '''pdf''']) || Jessie Butler (20+10) |
|- | |- | ||
|11:00 || '''Charge Item 1''': Design report including modifications to beamline, SBS and detectors ([https://hallaweb.jlab.org/wiki/index.php/File:GEn_ERR.pptx '''ppt''']) || Robin Wines (20+10) | |11:00 || '''Charge Item 1''': Design report including modifications to beamline, SBS and detectors ([https://hallaweb.jlab.org/wiki/index.php/File:GEn_ERR.pptx '''ppt''']) || Robin Wines (20+10) | ||
Line 41: | Line 41: | ||
|13:30 || '''Charge Item 1e''': Coordinate Detector (['''pdf''']) || Peter Monahan (20+10) | |13:30 || '''Charge Item 1e''': Coordinate Detector (['''pdf''']) || Peter Monahan (20+10) | ||
|- | |- | ||
− | |14:00 || '''Charge Item 1f''': GEp experiment DAQ (['''pdf''']) || Alex Camsonne(20+10) | + | |14:00 || '''Charge Item 1f and 5''': GEp experiment DAQ (['''pdf''']) || Alex Camsonne(20+10) |
|- | |- | ||
|14:30 || '''Charge Item 1f''': Trigger based on fADC (['''pdf''']) || Ben Raydo (20+10) | |14:30 || '''Charge Item 1f''': Trigger based on fADC (['''pdf''']) || Ben Raydo (20+10) | ||
Line 47: | Line 47: | ||
|15:30 || '''Break''' || (20) | |15:30 || '''Break''' || (20) | ||
|- | |- | ||
− | |15:50 || | + | |15:50 || '''Charge Item 8''': The beam commissioning procedures and polarimetry (['''pdf''']) || William Henry (20+10) |
|- | |- | ||
− | |16:20 || | + | |16:20 || '''Charge Item 7, 9''': Safety Documents for GEp (['''pdf''']) || Evaristo Cisbani (20+10) |
|- | |- | ||
|16:50 || Closed Session || (40) | |16:50 || Closed Session || (40) |
Revision as of 17:47, 31 March 2023
Experimental Readiness Review 2023
- Date: April 24 2023 (Monday)
- Location: L102
- ERR Committee
Agenda
Morning | Session | ||
8:00 | Closed Session | (20) | |
8:20 | Remarks from Chair and Charge | Chair (10) | |
8:30 | Charge item 1: The status of the equipment required for this experiment (pdf) | BogdanW (10+10) | |
8:50 | Charge Items 1b, 2a: SBS GEM tracker ([pdf]). | Nilanga Liyanage, Holly Szumila-Vance (20+10) | |
9:20 | Charge Items 1c, 2b, and 5: The simulation and data analysis software status for the experiment ([pdf]) | Andrew Puckett (20+10) | |
9:50 | Charge Item 3: The responsibilities, manpower and other resources ([pdf]) | Mark Jones (10+10) | |
10:10 | Break | (20) | |
10:30 | Charge Item 4: The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations (pdf) | Jessie Butler (20+10) | |
11:00 | Charge Item 1: Design report including modifications to beamline, SBS and detectors (ppt) | Robin Wines (20+10) | |
11:30 | Charge Item 1a: Target and scattering chamber configuration ([pdf]) | S. Covrig Dusa (10+10) | |
11:50 | Lunch | (70) | |
Afternoon | Session | ||
13:00 | Charge Item 1d: ECAL calorimeter (ppt) | Donald Jones (20+10) | |
13:30 | Charge Item 1e: Coordinate Detector ([pdf]) | Peter Monahan (20+10) | |
14:00 | Charge Item 1f and 5: GEp experiment DAQ ([pdf]) | Alex Camsonne(20+10) | |
14:30 | Charge Item 1f: Trigger based on fADC ([pdf]) | Ben Raydo (20+10) | |
15:30 | Break | (20) | |
15:50 | Charge Item 8: The beam commissioning procedures and polarimetry ([pdf]) | William Henry (20+10) | |
16:20 | Charge Item 7, 9: Safety Documents for GEp ([pdf]) | Evaristo Cisbani (20+10) | |
16:50 | Closed Session | (40) | |
17:30 | Closeout | ||
Draft of COO (pdf) | |||
Draft of ERG (pdf) and chart (pdf) | |||
Draft of ESAD (pdf) | |||
Input for RSAD from Radcon (radiation budget form) (pdf) | |||
OSP for Hadron Calorimeter, HCal-J (pdf) | |||
OSP for Coordinate Detector, CDet (pdf) | |||
OSP for GEM detectors (pdf) |