Difference between revisions of "ERR"
From Hall A Wiki
(→Agenda) |
(→Agenda) |
||
Line 16: | Line 16: | ||
| 8:15 || Remarks from Chair and Charge || Chair (5) | | 8:15 || Remarks from Chair and Charge || Chair (5) | ||
|- | |- | ||
− | | 8:20 || '''Charge item 1''': Experiment plan as approved by PAC47 | + | | 8:20 || '''Charge item 1''': Experiment plan as approved by PAC47 ([https://hallaweb.jlab.org/wiki/index.php/File:GEP_ERR_BW.pdf '''pdf''']) || BogdanW (10+5) |
|- | |- | ||
| 8:35 || '''Charge Item 1, 4''': Design report including modifications to beamline, SBS and detectors () || Robin Wines (15+15) | | 8:35 || '''Charge Item 1, 4''': Design report including modifications to beamline, SBS and detectors () || Robin Wines (15+15) |
Revision as of 15:55, 5 April 2023
Experimental Readiness Review 2023
- Date: April 24 2023 (Monday)
- Location: L102
- ERR Committee ([1])
- ERR Charge ([2])
- GEp Proposal ([3])
- GEp Proposal Update ([4])
Agenda
Morning | Session | ||
8:00 | Closed Session | (15) | |
8:15 | Remarks from Chair and Charge | Chair (5) | |
8:20 | Charge item 1: Experiment plan as approved by PAC47 (pdf) | BogdanW (10+5) | |
8:35 | Charge Item 1, 4: Design report including modifications to beamline, SBS and detectors () | Robin Wines (15+15) | |
9:05 | Charge Items 1c, 2b, and 6: The simulation and data analysis software status for the experiment ([pdf]) | Andrew Puckett (20+20) | |
9:45 | Break | (15) | |
10:00 | Charge Items 1b, 2a: GEMs and associated electronics; GEM reconstruction efficiency at high rate ([pdf]). | Holly Szumila-Vance (20+20) | |
10:40 | Charge Item 1d: ECAL calorimeter (ppt) | Donald Jones (20+20) | |
11:20 | Charge Item 1f and 5: GEp experiment DAQ and Slow Controls ([pdf]) | Alex Camsonne(10+10) | |
11:40 | Charge Item 1f: Trigger based on fADC ([pdf]) | Ben Raydo (10+10) | |
12:00 | Lunch | (60) | |
Afternoon | Session | ||
13:00 | Charge Item 1e: Coordinate Detector ([pdf]) | Peter Monaghan (15+10) | |
13:25 | Charge Item 1a: Target and scattering chamber configuration ([pdf]) | S. Covrig Dusa (10+10) | |
13:45 | Charge Item 4: Installation (pdf) | Jessie Butler (15+15) | |
14:15 | Charge Item 3: The responsibilities, manpower and other resources ([pdf]) | Mark Jones (10+10) | |
14:35 | Break | (15) | |
14:50 | Charge Item 8: The beam commissioning procedures and polarimetry ([pdf]) | William Henry (10+10) | |
15:10 | Charge Item 7, 9: RSAD, Safety Documents for GEp ([pdf]) | Evaristo Cisbani (10+10) | |
15:30 | Closed Session | (2 hours) | |
17:30 | Closeout | ||
Draft of COO (pdf) | |||
Draft of ERG (pdf) and chart (pdf) | |||
Draft of ESAD (pdf) | |||
RSAD from Radcon (pdf) | |||
OSP for Hadron Calorimeter, HCal-J ([5]) | |||
OSP for Coordinate Detector, CDet (pdf) | |||
OSP for GEM detectors (pdf) |
More details on Content of the talks
8:00 | Closed Session | (15) | |
8:15 | Remarks from Chair and Charge | Chair (5) | |
8:20 | Charge item 1: The GEp experiment plan as approved by PAC47 | BogdanW | |
8:35 | Charge Item 1: Design report including modifications to beamline, SBS and detectors | Robin Wines | |
9:05 | Charge Items 1c, 2b, and 6: The simulation and data analysis software status for the experiment | Andrew Puckett | |
10:00 | Charge Items 1b, 2a: GEMs and associated electronics; GEM reconstruction efficiency at high rate | Holly Szumila-Vance | |
10:40 | Charge Item 1d: ECAL, the plan for lead-glass annealing during data taking | Donald Jones | |
11:20 | Charge Item 1f and 5: GEp experiment the DAQ and the slow controls | Alex Camsonne | |
11:40 | Charge Item 1f: Coincidence trigger based on fADC | Ben Raydo | |
13:00 | Charge Item 1e: Coordinate Detector and associated electronics | Peter Monaghan | |
13:25 | Charge Item 1a: Target and scattering chamber configuration | S. Covrig Dusa | |
13:45 | Charge Item 4: The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations | Jessie Butler | |
14:15 | Charge Item 3: The responsibilities for each job identified, the manpower and other resources necessary to complete them on time | Mark Jones | |
14:50 | Charge Item 8: The beam commissioning procedures and polarimetry | William Henry | |
15:10 | Charge Item 7, 9: The status of the specific documentation and procedures (COO, ESAD, RSAD, ERG, OSP’s, operation manuals | Evaristo Cisbani |