* SBS side LV:
 
* SBS side LV:
** Joe to connect, instruct on controls (DONE!)
+
** Ellen to install some controller and readback (in progress)
** Ellen to install some controller and readback (in progress, Ellen working with accelerator)
+
** Input the jumpers on the breakout panel (DONE!)
+
** Run the cables (in progress, Armen adding connectors)
+
  
 
* SBS GEMs:
 
* SBS GEMs:
** Install XW into stack (DONE!)
 
** Finish signal cabling (asap)
 
** Connect to HV patches (after HDMI cabling complete)
 
** reconnect gas to RP layers (after BB XY work?)
 
 
** techs to install final shielding blocks around the electronics hut  
 
** techs to install final shielding blocks around the electronics hut  
 +
** Check low-levels, cosmics
 +
** Techs to install scintillators next week
  
 
* BB GEMs:
 
* BB GEMs:
** Upgrade the XY HV, re-install (do we need to do this now?)
+
** Check low-levels, cosmics
  
 
* Readout:
 
* Readout:
 
** Balance VTP fibers amongst crates to optimize (after GEMs are installed)
 
** Balance VTP fibers amongst crates to optimize (after GEMs are installed)
** Ensure that reboot/troubleshooting script works for all crates (DONE!)
 
  
 
* High voltage:
 
* High voltage:
** Finish channels in GUI (DONE!)
 
 
** move HV to working reboot strip (done, but need to add to gui)
 
** move HV to working reboot strip (done, but need to add to gui)
** finalize script for GUI upload of HV and operation (DONE!)
+
** Add variables to accelerator to request for archiving
  
 
* Update the documentation on the HV and LV operations (before beam)
 
* Update the documentation on the HV and LV operations (before beam)
 
* GEM experts on call (setup before beam)
 
* GEM experts on call (setup before beam)
* Clean up our areas (should start now, little by little)
+
* Clean up our areas (in progress)

Revision as of 16:07, 28 March 2024

  • SBS side LV:
    • Ellen to install some controller and readback (in progress)
  • SBS GEMs:
    • techs to install final shielding blocks around the electronics hut
    • Check low-levels, cosmics
    • Techs to install scintillators next week
  • BB GEMs:
    • Check low-levels, cosmics
  • Readout:
    • Balance VTP fibers amongst crates to optimize (after GEMs are installed)
  • High voltage:
    • move HV to working reboot strip (done, but need to add to gui)
    • Add variables to accelerator to request for archiving
  • Update the documentation on the HV and LV operations (before beam)
  • GEM experts on call (setup before beam)
  • Clean up our areas (in progress)