Revision as of 09:16, 29 March 2024
- SBS side LV:
- Ellen to install some controller and readback (in progress)
- SBS GEMs:
- techs to install final shielding block around the electronics hut
- Check low-levels, cosmics (in progress)
- Techs to install scintillators today
- BB GEMs:
- Check low-levels, cosmics (in progress)
- High voltage:
- move HV to working reboot strip (done, but need add to documentation)
- Add variables to accelerator to request for archiving (will do today)
- Update the documentation on the HV and LV operations (before beam)
- GEM experts on call (setup before beam)
- Clean up our areas (in progress)