Line 12: Line 12:
 
* High voltage:
 
* High voltage:
 
** move HV to working reboot strip (done, but need add to documentation)
 
** move HV to working reboot strip (done, but need add to documentation)
** Add variables to accelerator to request for archiving (will do today)
 
  
 
* Update the documentation on the HV and LV operations (before beam)
 
* Update the documentation on the HV and LV operations (before beam)
 
* GEM experts on call (in progress)
 
* GEM experts on call (in progress)
 
* Clean up our areas (in progress)
 
* Clean up our areas (in progress)

Revision as of 11:50, 29 March 2024

  • SBS side LV:
    • Ellen to install some controller and readback (in progress)
  • SBS GEMs:
    • techs to install final shielding block around the electronics hut
    • Check low-levels, cosmics (in progress)
    • Techs to install scintillators today
  • BB GEMs:
    • Check low-levels, cosmics (in progress)
  • High voltage:
    • move HV to working reboot strip (done, but need add to documentation)
  • Update the documentation on the HV and LV operations (before beam)
  • GEM experts on call (in progress)
  • Clean up our areas (in progress)