Line 12: | Line 12: | ||
* High voltage: | * High voltage: | ||
** move HV to working reboot strip (done, but need add to documentation) | ** move HV to working reboot strip (done, but need add to documentation) | ||
− | |||
* Update the documentation on the HV and LV operations (before beam) | * Update the documentation on the HV and LV operations (before beam) | ||
* GEM experts on call (in progress) | * GEM experts on call (in progress) | ||
* Clean up our areas (in progress) | * Clean up our areas (in progress) |
Revision as of 11:50, 29 March 2024
- SBS side LV:
- Ellen to install some controller and readback (in progress)
- SBS GEMs:
- techs to install final shielding block around the electronics hut
- Check low-levels, cosmics (in progress)
- Techs to install scintillators today
- BB GEMs:
- Check low-levels, cosmics (in progress)
- High voltage:
- move HV to working reboot strip (done, but need add to documentation)
- Update the documentation on the HV and LV operations (before beam)
- GEM experts on call (in progress)
- Clean up our areas (in progress)