Difference between revisions of "Noteable events list for d2n"
From Hall A Wiki
(→Major Changes) |
|||
Line 51: | Line 51: | ||
*02/12/09 | *02/12/09 | ||
+ | **8:30: North Linac access | ||
+ | **12:01: Cell MOSS prepared | ||
+ | **14:54: LHRS FrontEnd Busy set to 60us | ||
+ | **16:17: Changed scintillator HV by 10% | ||
+ | **16:47: Trigger Latch Pattern Map updated | ||
+ | **17:52: ADC data ready wait loop changed from 1000 to 10000 | ||
+ | |||
+ | *02/13/09 | ||
+ | **20:47: BB Cer 1pe adjusted to 50mV | ||
+ | **21:15: BB cer signals moved to chan 32-63 of 1881 ADC in ROC8 slot 9 | ||
+ | **22:05: BB disc. group signal now 30ns(signal that is AND with shower) | ||
+ | **23:02: shift BB retime L1A by 25ns | ||
+ | **23:41: Hole in T6 trigger | ||
+ | |||
+ | *02/14/09 | ||
+ | **00:24: BB_sh T6 thresh -80mV | ||
+ | **00:47: Removed T1 from BB datamon | ||
+ | |||
+ | *02/15/09 | ||
+ | ** |
Revision as of 18:04, 28 May 2009
Experiment Changes
Beam Pass Changes
- February Media:Feb_beam_energy.png
Major Changes
- 02/05/09
- 18:05: 3He cell SAMANTHA and reference cell GMA installed
- 02/07/09
- 18:43-21:52: BB CAMAC crate down
- 22:29: BB TDC delay cables fixed(~360ns)
- 22:29: BB Cer output widths on discriminator set to 100ns
- 02/08/09
- 15:39: Oven temp controller replaced
- 16:00: DAQ set to 1DAQ
- 17:50: Ethane/Argon mix on pressure regulator at 1psi
- 02/09/09
- 17:03: BB MWDC gas system pressures returned (Ethane/Argon)
- 02/10/09
- 06:51: LHRS polarity set to +
- 09:44: BB sieve in
- 10:29: BB Wire Chamber thresholds changed C1=3.9V,C2=4.8V,C3=4.8V
- 11:17: T6:threshold_BB -s BB_Sh -120mV->450MeV
- 11:17: T1:threshold_BB -s BB_Sh_2 -80V->300MeV
- 11:31: PMTs put in flash ADCs
- 14:10: seive out
- 14:16: PMTs back in V792 ADC
- 16:35: RHRS DAQ restored for pvdis parasites
- 17:55: BB T1,T6 thresholds set to -10mV
- 18:15: BB polarity set to positive
- 19:08: BB sieve in
- 20:18: Threshold for BB_Sh=-0.120V BB_Sh_2=-0.080V BB_cer=-0.070V
- 20:58: BB Cer T2 timing,outputs of AND units normalized to 150ns
- 20:58: BB Cer T2 timing, output of P706 shortened to 50ns
- 21:33: Compton HV = -1800V
- 02/11/09
- 03:25: Sieve out
- 08:20: BB and LHRS polarity changed to negative
- 09:56: DAQ put in 2DAQ mode
- 09:58: T3 T4 trigger cables unplugged from BB
- 11:17: 0.3x attenuuator added to photon signal going into DAQ
- 15:18: BB MWDC threshold change
- front = 3.898
- mid = 4.800
- back = 4.800
- 22:56: Sync problems in ROC4, slot 18 (1875 TDC) missing gates in buffer mode
- 02/12/09
- 8:30: North Linac access
- 12:01: Cell MOSS prepared
- 14:54: LHRS FrontEnd Busy set to 60us
- 16:17: Changed scintillator HV by 10%
- 16:47: Trigger Latch Pattern Map updated
- 17:52: ADC data ready wait loop changed from 1000 to 10000
- 02/13/09
- 20:47: BB Cer 1pe adjusted to 50mV
- 21:15: BB cer signals moved to chan 32-63 of 1881 ADC in ROC8 slot 9
- 22:05: BB disc. group signal now 30ns(signal that is AND with shower)
- 23:02: shift BB retime L1A by 25ns
- 23:41: Hole in T6 trigger
- 02/14/09
- 00:24: BB_sh T6 thresh -80mV
- 00:47: Removed T1 from BB datamon
- 02/15/09