|
|
Line 1: |
Line 1: |
− | {|border="1" style="text-align:left"
| + | |
− | |+ HAPPEx III Work List
| + | |
− | ! What !! Postdoc !! Description
| + | |
− | |-
| + | |
− | ! DAQ
| + | |
− | | Dustin
| + | |
− | | AutoDB and blinding
| + | |
− | |-
| + | |
− | ! Analysis chain
| + | |
− | | Mark
| + | |
− | | Run analysis on HAPPEx II data
| + | |
− | |-
| + | |
− | ! Detector prep
| + | |
− | | Dustin
| + | |
− | |
| + | |
− | |-
| + | |
− | ! Moller polarimeter
| + | |
− | | Dustin
| + | |
− | | Dustin, Luis and Sasha become experts at running the Moller polarimeter
| + | |
− | |-
| + | |
− | ! Compton polarimeter
| + | |
− | | Mark
| + | |
− | |
| + | |
− | * Electron detector (Alex, Bob)
| + | |
− | * Increase IR cavity power (Mark)
| + | |
− | |-
| + | |
− | ! Accelerator dev/liason
| + | |
− | | Mark and Dustin
| + | |
− | |
| + | |
− | * Run 8 cables to source table (Riad)
| + | |
− | * Modulation
| + | |
− | |-
| + | |
− | ! Installation planning
| + | |
− | |
| + | |
− | |
| + | |
− | * When is the detector going in?
| + | |
− | * What tools are needed?
| + | |
− | * <span style="color:red"> Give Ed a list of surveys that are required </span>
| + | |
− | |-
| + | |
− | ! Commissioning planning
| + | |
− | |
| + | |
− | |
| + | |
− | |-
| + | |
− | ! Documentation and administration
| + | |
− | |
| + | |
− | |
| + | |
− | * COO, ESAD, TSOP must be produced. Shift workers must be asked to read and sign before shift.
| + | |
− | * Target training must be organised and advertised.
| + | |
− | * <span style="color:gray"> Shift schedule and signup sheet (done) </span>
| + | |
− | * Run coordinator signup (Xiaochao)
| + | |
− | * Online documentation for shift workers
| + | |
− | |-
| + | |
− | |}
| + | |