Difference between revisions of "Setup as installed"

From Hall A Wiki
Jump to: navigation, search
Line 1: Line 1:
 
Back to [[DVCS]]
 
Back to [[DVCS]]
  
This page show the setup we have installed
+
[[Photos]]
 +
 
 +
Bellow is the setup we have decided on.
  
 
==Target==
 
==Target==

Revision as of 23:03, 19 August 2010

Back to DVCS

Photos

Bellow is the setup we have decided on.

Target

- 15cm LH2 loop
- 15cm LD2 loop
- 15cm spare loop

Solid ladder:
- 15cm dummy
- C: 1mm foil
- Optics: Multi (7) 1mm C foils
- BeO
- Cross hair
- Empty

Left HRS

- S0
- S1
- S2
- Short Cerenkov
- Pion rejector