Difference between revisions of "Wednesday, March 30, 10:00 AM EDT"
From Hall A Wiki
Line 21: | Line 21: | ||
### Is this the correct subgroup for Souder's counting mode pion detector? | ### Is this the correct subgroup for Souder's counting mode pion detector? | ||
# Integrating detectors (Mark, Michael, Dave M.) | # Integrating detectors (Mark, Michael, Dave M.) | ||
− | ## Background: Director's Review Integrating Detectors Talk (see slides | + | ## Background: Director's Review Integrating Detectors Talk (see slides 2,3,18,19,27,31) [http://www.jlab.org/~pitt/telecon_talks/integratingdetectors_mack.pdf Integrating Detectors info] |
## Background: Initial CAD layout from Dec. 2010 KK talk [http://www.jlab.org/~pitt/telecon_talks/mollercad_detectors.pdf Detectors CAD info] | ## Background: Initial CAD layout from Dec. 2010 KK talk [http://www.jlab.org/~pitt/telecon_talks/mollercad_detectors.pdf Detectors CAD info] | ||
## Issues | ## Issues |
Revision as of 08:51, 30 March 2011
Agenda
Note: agenda is still being edited
- General goals for this "supergroup" (Mark/KK)
- Beam monitoring (Mark)
- Background material Beam monitoring info
- Beam size monitor with cavities (Mike Woods, SLAC, KK mentioned this)
- Beam monitor parasitic development work (KK potentially has graduate student available for this)
- Synchrotron radiation - any issues here?
- R&D plan needs to focus primarily on charge monitoring - how to proceed? (ie. parasitic work in Hall A or C or both? Qweak may be resistant to changes since things are working at an acceptable level now, but that is not confirmed.)
- Tracking (Mark, David A.)
- Background: Director's Review Tracking Talk (see slides 4,8,9,10,12) Tracking background info
- Background: Initial CAD layout from Dec. 2010 KK talk Tracking CAD info
- Background: Small acceptance pion counting detector from Souder Dec. 2010 talk Souder pion detector info
- Are we happy with decision to just measure scattered theta and not E'?
- Can initial work proceed without further simulations (other than default profiles of the scattered flux at the three z locations)?
- What work needs to be done by summer? (suggestions:)
- further "Roman pot" research
- finalize decision for "Region 3" technology - straws or GEMs?
- Learn more about running GEMs in vacuum (assuming that is default choice for Region 1 and 2)
- Number/sizes of detectors in each region
- Is this the correct subgroup for Souder's counting mode pion detector?
- Integrating detectors (Mark, Michael, Dave M.)
- Background: Director's Review Integrating Detectors Talk (see slides 2,3,18,19,27,31) Integrating Detectors info
- Background: Initial CAD layout from Dec. 2010 KK talk Detectors CAD info
- Issues
- Next meeting time/goals
Return to MOLLER at 11 GeV E09-005